Cargando…
Considerations for the Injection and Extraction Kicker Systems of a 100 TeV Centre-of-Mass FCC-hh Collider
A 100 TeV center-of-mass energy frontier proton collider in a new tunnel of ~100 km circumference is a central part of CERN's Future Circular Colliders (FCC) design study. One of the major challenges for such a machine will be the beam injection and extraction. This paper outlines the recent de...
Autores principales: | Kramer, Thomas, Barna, Daniel, Barnes, Michael, Bartmann, Wolfgang, Burkart, Florian, Ducimetière, Laurent, Goddard, Brennan, Senaj, Viliam, Stadlbauer, Tobias, Woog, David |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2016-THPOR049 http://cds.cern.ch/record/2207483 |
Ejemplares similares
-
Future circular collider injection and extraction kicker topologies and solid state generators
por: Barnes, M J, et al.
Publicado: (2019) -
Considerations for the Beam Dump System of a 100 TeV Centre-of-mass FCC hh Collider
por: Kramer, Thomas, et al.
Publicado: (2015) -
Considerations on an Upgrade Possibility of the LHC Beam Dump Kicker System
por: Fraser, Matthew, et al.
Publicado: (2016) -
Optimization of the FCC-hh Beam Extraction System Regarding Failure Avoidance and Mitigation
por: Renner, Elisabeth, et al.
Publicado: (2018) -
Preliminary Estimate of Beam Induced Power Deposition in a FCC-hh Injection Kicker Magnet
por: Chmielinska, Agnieszka, et al.
Publicado: (2017)