Cargando…
High Gradient Properties of a CLIC Prototype Accelerating Structure made by Tsinghua University
A CLIC prototype structure, T24_THU_#1, was recently high-gradient tested at KEK X-band test stand, Nextef. The copper parts of this 24-cell TW structure were delivered from CERN, were bonded and brazed, bench-tested and tuned in Tsinghua University. The aim of this test was not only to verify the c...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2016-THPOR041 http://cds.cern.ch/record/2207492 |
Sumario: | A CLIC prototype structure, T24_THU_#1, was recently high-gradient tested at KEK X-band test stand, Nextef. The copper parts of this 24-cell TW structure were delivered from CERN, were bonded and brazed, bench-tested and tuned in Tsinghua University. The aim of this test was not only to verify the cavity high-gradient properties under 100 MV/m but also to study the breakdown phenomenon in high gradient. High power test results were presented and breakdown rate under 100 MV/m was compared to previously-tested CLIC prototype structures. The assembly capability of Tsinghua University for X-band high gradient structures was validated by the good high gradient performance of T24_THU_#1. |
---|