Cargando…

Commissioning of the Machine Protection Systems of the Large Hadron Collider Following its First Long Shutdown

During the first long shutdown of the Large Hadron Collider (LHC) extending for more than 18 months, most Machine Protection Systems (MPS) have undergone significant changes, and upgrades. A full re-commissioning of the MPS was performed at the end of the shutdown and during the LHC beam commissioni...

Descripción completa

Detalles Bibliográficos
Autores principales: Wollmann, Daniel, Schmidt, Ruediger, Uythoven, Jan, Wenninger, Jorg, Zerlauth, Markus
Lenguaje:eng
Publicado: 2016
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2016-THPOY045
http://cds.cern.ch/record/2207502
_version_ 1780951821114671104
author Wollmann, Daniel
Schmidt, Ruediger
Uythoven, Jan
Wenninger, Jorg
Zerlauth, Markus
author_facet Wollmann, Daniel
Schmidt, Ruediger
Uythoven, Jan
Wenninger, Jorg
Zerlauth, Markus
author_sort Wollmann, Daniel
collection CERN
description During the first long shutdown of the Large Hadron Collider (LHC) extending for more than 18 months, most Machine Protection Systems (MPS) have undergone significant changes, and upgrades. A full re-commissioning of the MPS was performed at the end of the shutdown and during the LHC beam commissioning in 2015. To verify the correct functioning of all protection-relevant systems with beam, a step-wise intensity ramp-up was performed, reaching at the end of 2015 a record stored beam energy of ~280 MJ per beam, nearly 80% of the value in the design report. This contribution summarizes the results of the MPS commissioning, the intensity ramp-up and the continuous follow-up during operation, focusing mainly on near misses and false triggers and their proposed mitigations. A strategy to minimize risks during machine development periods for future operation of the LHC, when the protection parameters are modified for several tests, is discussed. The machine protection strategy for the LHC run in 2016 is presented.
id oai-inspirehep.net-1470752
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2016
record_format invenio
spelling oai-inspirehep.net-14707522022-08-10T12:48:25Zdoi:10.18429/JACoW-IPAC2016-THPOY045http://cds.cern.ch/record/2207502engWollmann, DanielSchmidt, RuedigerUythoven, JanWenninger, JorgZerlauth, MarkusCommissioning of the Machine Protection Systems of the Large Hadron Collider Following its First Long ShutdownAccelerators and Storage RingsDuring the first long shutdown of the Large Hadron Collider (LHC) extending for more than 18 months, most Machine Protection Systems (MPS) have undergone significant changes, and upgrades. A full re-commissioning of the MPS was performed at the end of the shutdown and during the LHC beam commissioning in 2015. To verify the correct functioning of all protection-relevant systems with beam, a step-wise intensity ramp-up was performed, reaching at the end of 2015 a record stored beam energy of ~280 MJ per beam, nearly 80% of the value in the design report. This contribution summarizes the results of the MPS commissioning, the intensity ramp-up and the continuous follow-up during operation, focusing mainly on near misses and false triggers and their proposed mitigations. A strategy to minimize risks during machine development periods for future operation of the LHC, when the protection parameters are modified for several tests, is discussed. The machine protection strategy for the LHC run in 2016 is presented.CERN-ACC-2016-121oai:inspirehep.net:14707522016
spellingShingle Accelerators and Storage Rings
Wollmann, Daniel
Schmidt, Ruediger
Uythoven, Jan
Wenninger, Jorg
Zerlauth, Markus
Commissioning of the Machine Protection Systems of the Large Hadron Collider Following its First Long Shutdown
title Commissioning of the Machine Protection Systems of the Large Hadron Collider Following its First Long Shutdown
title_full Commissioning of the Machine Protection Systems of the Large Hadron Collider Following its First Long Shutdown
title_fullStr Commissioning of the Machine Protection Systems of the Large Hadron Collider Following its First Long Shutdown
title_full_unstemmed Commissioning of the Machine Protection Systems of the Large Hadron Collider Following its First Long Shutdown
title_short Commissioning of the Machine Protection Systems of the Large Hadron Collider Following its First Long Shutdown
title_sort commissioning of the machine protection systems of the large hadron collider following its first long shutdown
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-IPAC2016-THPOY045
http://cds.cern.ch/record/2207502
work_keys_str_mv AT wollmanndaniel commissioningofthemachineprotectionsystemsofthelargehadroncolliderfollowingitsfirstlongshutdown
AT schmidtruediger commissioningofthemachineprotectionsystemsofthelargehadroncolliderfollowingitsfirstlongshutdown
AT uythovenjan commissioningofthemachineprotectionsystemsofthelargehadroncolliderfollowingitsfirstlongshutdown
AT wenningerjorg commissioningofthemachineprotectionsystemsofthelargehadroncolliderfollowingitsfirstlongshutdown
AT zerlauthmarkus commissioningofthemachineprotectionsystemsofthelargehadroncolliderfollowingitsfirstlongshutdown