Cargando…
Commissioning of the Machine Protection Systems of the Large Hadron Collider Following its First Long Shutdown
During the first long shutdown of the Large Hadron Collider (LHC) extending for more than 18 months, most Machine Protection Systems (MPS) have undergone significant changes, and upgrades. A full re-commissioning of the MPS was performed at the end of the shutdown and during the LHC beam commissioni...
Autores principales: | Wollmann, Daniel, Schmidt, Ruediger, Uythoven, Jan, Wenninger, Jorg, Zerlauth, Markus |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2016-THPOY045 http://cds.cern.ch/record/2207502 |
Ejemplares similares
-
Concept of beam-related machine protection for the Future Circular Collider
por: Nie, Yuancun, et al.
Publicado: (2019) -
Operational performance of the machine protection systems of the Large Hadron Collider during Run 2 and lessons learnt for the LIU/HL-LHC era
por: Zerlauth, Markus, et al.
Publicado: (2019) -
Machine Protection Strategy for LHC Commissioning and Outlook for Future Challenges
por: Salvachua, B, et al.
Publicado: (2015) -
Commissioning and operation of the machine protection system
por: Ponce, L, et al.
Publicado: (2014) -
Machine Protection Systems Performance And Issues 2012
por: Wollmann, D, et al.
Publicado: (2012)