Cargando…
Consolidation of the LHC Superconducting Magnets and Circuits
The first Large Hadron Collider (LHC) Long Shutdown (LS1) started in February 2013. It was triggered by the need to consolidate the 13-kA splices between the superconducting magnets to allow the LHC to reach safely its design energy of 14 TeV center of mass. The Superconducting Magnets and Circuits...
Autores principales: | , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/TASC.2016.2528406 http://cds.cern.ch/record/2261464 |
_version_ | 1780954114407006208 |
---|---|
author | Tock, J Ph Atieh, S Bodart, D Bordry, F Bourcey, N Charifoulline, Z Cruikshank, P Dahlerup-Petersen, K Dalin, J M Garion, C Musso, A Ostojic, R Perin, A Pojer, M Prin, H Savary, F Scheuerlein, Ch |
author_facet | Tock, J Ph Atieh, S Bodart, D Bordry, F Bourcey, N Charifoulline, Z Cruikshank, P Dahlerup-Petersen, K Dalin, J M Garion, C Musso, A Ostojic, R Perin, A Pojer, M Prin, H Savary, F Scheuerlein, Ch |
author_sort | Tock, J Ph |
collection | CERN |
description | The first Large Hadron Collider (LHC) Long Shutdown (LS1) started in February 2013. It was triggered by the need to consolidate the 13-kA splices between the superconducting magnets to allow the LHC to reach safely its design energy of 14 TeV center of mass. The Superconducting Magnets and Circuits Consolidation (SMACC) project has principally covered the consolidation of the 10170 13-kA splices but also other activities linked to the superconducting magnets such as the exchange of 18 main cryomagnets, the installation of the additional safety relief devices, the repair of known helium leaks, and other consolidation activities. All these works have been structured in a project, gathering about 280 persons. The opening of the interconnections started in April 2013 and consolidation works were completed by September 2014. This paper first describes the preparation phase with the building of the teams and the detailed planning of the operations. Then, this paper carried out is summarized, and the main results achieved are presented. Finally, it gives feedback from the worksite, namely lessons learnt and adaptations that were implemented, both from the technical and organizational points of view. |
id | oai-inspirehep.net-1479359 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2016 |
record_format | invenio |
spelling | oai-inspirehep.net-14793592019-09-30T06:29:59Zdoi:10.1109/TASC.2016.2528406http://cds.cern.ch/record/2261464engTock, J PhAtieh, SBodart, DBordry, FBourcey, NCharifoulline, ZCruikshank, PDahlerup-Petersen, KDalin, J MGarion, CMusso, AOstojic, RPerin, APojer, MPrin, HSavary, FScheuerlein, ChConsolidation of the LHC Superconducting Magnets and CircuitsAccelerators and Storage RingsThe first Large Hadron Collider (LHC) Long Shutdown (LS1) started in February 2013. It was triggered by the need to consolidate the 13-kA splices between the superconducting magnets to allow the LHC to reach safely its design energy of 14 TeV center of mass. The Superconducting Magnets and Circuits Consolidation (SMACC) project has principally covered the consolidation of the 10170 13-kA splices but also other activities linked to the superconducting magnets such as the exchange of 18 main cryomagnets, the installation of the additional safety relief devices, the repair of known helium leaks, and other consolidation activities. All these works have been structured in a project, gathering about 280 persons. The opening of the interconnections started in April 2013 and consolidation works were completed by September 2014. This paper first describes the preparation phase with the building of the teams and the detailed planning of the operations. Then, this paper carried out is summarized, and the main results achieved are presented. Finally, it gives feedback from the worksite, namely lessons learnt and adaptations that were implemented, both from the technical and organizational points of view.oai:inspirehep.net:14793592016 |
spellingShingle | Accelerators and Storage Rings Tock, J Ph Atieh, S Bodart, D Bordry, F Bourcey, N Charifoulline, Z Cruikshank, P Dahlerup-Petersen, K Dalin, J M Garion, C Musso, A Ostojic, R Perin, A Pojer, M Prin, H Savary, F Scheuerlein, Ch Consolidation of the LHC Superconducting Magnets and Circuits |
title | Consolidation of the LHC Superconducting Magnets and Circuits |
title_full | Consolidation of the LHC Superconducting Magnets and Circuits |
title_fullStr | Consolidation of the LHC Superconducting Magnets and Circuits |
title_full_unstemmed | Consolidation of the LHC Superconducting Magnets and Circuits |
title_short | Consolidation of the LHC Superconducting Magnets and Circuits |
title_sort | consolidation of the lhc superconducting magnets and circuits |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.1109/TASC.2016.2528406 http://cds.cern.ch/record/2261464 |
work_keys_str_mv | AT tockjph consolidationofthelhcsuperconductingmagnetsandcircuits AT atiehs consolidationofthelhcsuperconductingmagnetsandcircuits AT bodartd consolidationofthelhcsuperconductingmagnetsandcircuits AT bordryf consolidationofthelhcsuperconductingmagnetsandcircuits AT bourceyn consolidationofthelhcsuperconductingmagnetsandcircuits AT charifoullinez consolidationofthelhcsuperconductingmagnetsandcircuits AT cruikshankp consolidationofthelhcsuperconductingmagnetsandcircuits AT dahleruppetersenk consolidationofthelhcsuperconductingmagnetsandcircuits AT dalinjm consolidationofthelhcsuperconductingmagnetsandcircuits AT garionc consolidationofthelhcsuperconductingmagnetsandcircuits AT mussoa consolidationofthelhcsuperconductingmagnetsandcircuits AT ostojicr consolidationofthelhcsuperconductingmagnetsandcircuits AT perina consolidationofthelhcsuperconductingmagnetsandcircuits AT pojerm consolidationofthelhcsuperconductingmagnetsandcircuits AT prinh consolidationofthelhcsuperconductingmagnetsandcircuits AT savaryf consolidationofthelhcsuperconductingmagnetsandcircuits AT scheuerleinch consolidationofthelhcsuperconductingmagnetsandcircuits |