Cargando…

Consolidation of the LHC Superconducting Magnets and Circuits

The first Large Hadron Collider (LHC) Long Shutdown (LS1) started in February 2013. It was triggered by the need to consolidate the 13-kA splices between the superconducting magnets to allow the LHC to reach safely its design energy of 14 TeV center of mass. The Superconducting Magnets and Circuits...

Descripción completa

Detalles Bibliográficos
Autores principales: Tock, J Ph, Atieh, S, Bodart, D, Bordry, F, Bourcey, N, Charifoulline, Z, Cruikshank, P, Dahlerup-Petersen, K, Dalin, J M, Garion, C, Musso, A, Ostojic, R, Perin, A, Pojer, M, Prin, H, Savary, F, Scheuerlein, Ch
Lenguaje:eng
Publicado: 2016
Materias:
Acceso en línea:https://dx.doi.org/10.1109/TASC.2016.2528406
http://cds.cern.ch/record/2261464

Ejemplares similares