Cargando…
Cold Powering Tests of 11-T Nb$_{3}$Sn Dipole Models for LHC Upgrades at CERN
For the upgrade of the LHC in LS2 and for the High Luminosity upgrade in LS3, a few 15-m Nb-Ti main dipole magnets are foreseen to be replaced by two 5.5-m-long Nb$_{3}$Sn dipoles each. After a series of dipole models produced and tested by the collaborating partners at FNAL, in 2014 and 2015, the f...
Autores principales: | , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/TASC.2016.2540604 http://cds.cern.ch/record/2261334 |
_version_ | 1780954115705143296 |
---|---|
author | Willering, G Bajko, M Bordini, B Bottura, L Fiscarelli, L Izquierdo Bermudez, S Karppinen, M Löffler, C Perez, J C de Rijk, G Savary, F |
author_facet | Willering, G Bajko, M Bordini, B Bottura, L Fiscarelli, L Izquierdo Bermudez, S Karppinen, M Löffler, C Perez, J C de Rijk, G Savary, F |
author_sort | Willering, G |
collection | CERN |
description | For the upgrade of the LHC in LS2 and for the High Luminosity upgrade in LS3, a few 15-m Nb-Ti main dipole magnets are foreseen to be replaced by two 5.5-m-long Nb$_{3}$Sn dipoles each. After a series of dipole models produced and tested by the collaborating partners at FNAL, in 2014 and 2015, the first short dipole model magnets have been produced and tested at CERN in a single aperture configuration. In this paper, the test results and test analyses will be discussed with a focus on training and cold powering performance. |
id | oai-inspirehep.net-1479371 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2016 |
record_format | invenio |
spelling | oai-inspirehep.net-14793712019-09-30T06:29:59Zdoi:10.1109/TASC.2016.2540604http://cds.cern.ch/record/2261334engWillering, GBajko, MBordini, BBottura, LFiscarelli, LIzquierdo Bermudez, SKarppinen, MLöffler, CPerez, J Cde Rijk, GSavary, FCold Powering Tests of 11-T Nb$_{3}$Sn Dipole Models for LHC Upgrades at CERNAccelerators and Storage RingsFor the upgrade of the LHC in LS2 and for the High Luminosity upgrade in LS3, a few 15-m Nb-Ti main dipole magnets are foreseen to be replaced by two 5.5-m-long Nb$_{3}$Sn dipoles each. After a series of dipole models produced and tested by the collaborating partners at FNAL, in 2014 and 2015, the first short dipole model magnets have been produced and tested at CERN in a single aperture configuration. In this paper, the test results and test analyses will be discussed with a focus on training and cold powering performance.oai:inspirehep.net:14793712016 |
spellingShingle | Accelerators and Storage Rings Willering, G Bajko, M Bordini, B Bottura, L Fiscarelli, L Izquierdo Bermudez, S Karppinen, M Löffler, C Perez, J C de Rijk, G Savary, F Cold Powering Tests of 11-T Nb$_{3}$Sn Dipole Models for LHC Upgrades at CERN |
title | Cold Powering Tests of 11-T Nb$_{3}$Sn Dipole Models for LHC Upgrades at CERN |
title_full | Cold Powering Tests of 11-T Nb$_{3}$Sn Dipole Models for LHC Upgrades at CERN |
title_fullStr | Cold Powering Tests of 11-T Nb$_{3}$Sn Dipole Models for LHC Upgrades at CERN |
title_full_unstemmed | Cold Powering Tests of 11-T Nb$_{3}$Sn Dipole Models for LHC Upgrades at CERN |
title_short | Cold Powering Tests of 11-T Nb$_{3}$Sn Dipole Models for LHC Upgrades at CERN |
title_sort | cold powering tests of 11-t nb$_{3}$sn dipole models for lhc upgrades at cern |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.1109/TASC.2016.2540604 http://cds.cern.ch/record/2261334 |
work_keys_str_mv | AT willeringg coldpoweringtestsof11tnb3sndipolemodelsforlhcupgradesatcern AT bajkom coldpoweringtestsof11tnb3sndipolemodelsforlhcupgradesatcern AT bordinib coldpoweringtestsof11tnb3sndipolemodelsforlhcupgradesatcern AT bottural coldpoweringtestsof11tnb3sndipolemodelsforlhcupgradesatcern AT fiscarellil coldpoweringtestsof11tnb3sndipolemodelsforlhcupgradesatcern AT izquierdobermudezs coldpoweringtestsof11tnb3sndipolemodelsforlhcupgradesatcern AT karppinenm coldpoweringtestsof11tnb3sndipolemodelsforlhcupgradesatcern AT lofflerc coldpoweringtestsof11tnb3sndipolemodelsforlhcupgradesatcern AT perezjc coldpoweringtestsof11tnb3sndipolemodelsforlhcupgradesatcern AT derijkg coldpoweringtestsof11tnb3sndipolemodelsforlhcupgradesatcern AT savaryf coldpoweringtestsof11tnb3sndipolemodelsforlhcupgradesatcern |