Cargando…
Development of a 200-mm Short Model of Beam Separation Dipole for HL-LHC Upgrade
The High Energy Accelerator Research Organization (KEK) has been developing the beam separation dipole magnet for the High Luminosity Large Hadron Collider (HL-LHC) upgrade. The magnet has a coil aperture of 150 mm, using Nb-Ti superconducting cable, and a dipole magnetic field of 5.6 T will be gene...
Autores principales: | , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/TASC.2016.2529018 http://cds.cern.ch/record/2261340 |
_version_ | 1780954117017960448 |
---|---|
author | Enomoto, S Sugano, M Nakamoto, T Kawamata, H Okada, R Okada, N Higashi, N Ogitsu, T Sasaki, K Kimura, N Ikemoto, Y Musso, A Xu, Q Todesco, E |
author_facet | Enomoto, S Sugano, M Nakamoto, T Kawamata, H Okada, R Okada, N Higashi, N Ogitsu, T Sasaki, K Kimura, N Ikemoto, Y Musso, A Xu, Q Todesco, E |
author_sort | Enomoto, S |
collection | CERN |
description | The High Energy Accelerator Research Organization (KEK) has been developing the beam separation dipole magnet for the High Luminosity Large Hadron Collider (HL-LHC) upgrade. The magnet has a coil aperture of 150 mm, using Nb-Ti superconducting cable, and a dipole magnetic field of 5.6 T will be generated at 12 kA, at 1.9 K, to provide the field integral of 35 T·m. To verify the mechanical behavior of the magnet and to optimize the fabrication processes, we develop a 200-mm short model, which is the cross-sectional cutout of the magnet. The development includes validation of a series of fabrication processes. Coil stress in pole was monitored by strain gauges during collaring, yoking, and cooldown test. |
id | oai-inspirehep.net-1479391 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2016 |
record_format | invenio |
spelling | oai-inspirehep.net-14793912019-09-30T06:29:59Zdoi:10.1109/TASC.2016.2529018http://cds.cern.ch/record/2261340engEnomoto, SSugano, MNakamoto, TKawamata, HOkada, ROkada, NHigashi, NOgitsu, TSasaki, KKimura, NIkemoto, YMusso, AXu, QTodesco, EDevelopment of a 200-mm Short Model of Beam Separation Dipole for HL-LHC UpgradeAccelerators and Storage RingsThe High Energy Accelerator Research Organization (KEK) has been developing the beam separation dipole magnet for the High Luminosity Large Hadron Collider (HL-LHC) upgrade. The magnet has a coil aperture of 150 mm, using Nb-Ti superconducting cable, and a dipole magnetic field of 5.6 T will be generated at 12 kA, at 1.9 K, to provide the field integral of 35 T·m. To verify the mechanical behavior of the magnet and to optimize the fabrication processes, we develop a 200-mm short model, which is the cross-sectional cutout of the magnet. The development includes validation of a series of fabrication processes. Coil stress in pole was monitored by strain gauges during collaring, yoking, and cooldown test.oai:inspirehep.net:14793912016 |
spellingShingle | Accelerators and Storage Rings Enomoto, S Sugano, M Nakamoto, T Kawamata, H Okada, R Okada, N Higashi, N Ogitsu, T Sasaki, K Kimura, N Ikemoto, Y Musso, A Xu, Q Todesco, E Development of a 200-mm Short Model of Beam Separation Dipole for HL-LHC Upgrade |
title | Development of a 200-mm Short Model of Beam Separation Dipole for HL-LHC Upgrade |
title_full | Development of a 200-mm Short Model of Beam Separation Dipole for HL-LHC Upgrade |
title_fullStr | Development of a 200-mm Short Model of Beam Separation Dipole for HL-LHC Upgrade |
title_full_unstemmed | Development of a 200-mm Short Model of Beam Separation Dipole for HL-LHC Upgrade |
title_short | Development of a 200-mm Short Model of Beam Separation Dipole for HL-LHC Upgrade |
title_sort | development of a 200-mm short model of beam separation dipole for hl-lhc upgrade |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.1109/TASC.2016.2529018 http://cds.cern.ch/record/2261340 |
work_keys_str_mv | AT enomotos developmentofa200mmshortmodelofbeamseparationdipoleforhllhcupgrade AT suganom developmentofa200mmshortmodelofbeamseparationdipoleforhllhcupgrade AT nakamotot developmentofa200mmshortmodelofbeamseparationdipoleforhllhcupgrade AT kawamatah developmentofa200mmshortmodelofbeamseparationdipoleforhllhcupgrade AT okadar developmentofa200mmshortmodelofbeamseparationdipoleforhllhcupgrade AT okadan developmentofa200mmshortmodelofbeamseparationdipoleforhllhcupgrade AT higashin developmentofa200mmshortmodelofbeamseparationdipoleforhllhcupgrade AT ogitsut developmentofa200mmshortmodelofbeamseparationdipoleforhllhcupgrade AT sasakik developmentofa200mmshortmodelofbeamseparationdipoleforhllhcupgrade AT kimuran developmentofa200mmshortmodelofbeamseparationdipoleforhllhcupgrade AT ikemotoy developmentofa200mmshortmodelofbeamseparationdipoleforhllhcupgrade AT mussoa developmentofa200mmshortmodelofbeamseparationdipoleforhllhcupgrade AT xuq developmentofa200mmshortmodelofbeamseparationdipoleforhllhcupgrade AT todescoe developmentofa200mmshortmodelofbeamseparationdipoleforhllhcupgrade |