Progress on the HIE-ISOLDE Facility

After 20 years of successful ISOLDE operation at the PS-Booster*, a major upgrade of the facility, the HIE-ISOLDE (High Intensity and Energy ISOLDE) project was launched in 2010. It is divided into three parts; a staged upgrade of the REX post-accelerator to increase the beam energy from 3.3 MeV/u t...

Descripción completa

Detalles Bibliográficos
Autores principales: Kadi, Yacine, Delruelle, Nicolas, Ferreira Somoza, Jose, Garcia Borge, Maria, Gayde, Jean-Christophe, Kautzmann, Guillaume, Martino, Michele, Rodriguez, Jose, Siesling, Erwin, Valdarno, Luca, Venturini Delsolaro, Walter
Lenguaje:eng
Publicado: 2016
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-HIAT2015-MOM1I01
http://cds.cern.ch/record/2265926
_version_ 1780954506209525760
author Kadi, Yacine
Delruelle, Nicolas
Ferreira Somoza, Jose
Garcia Borge, Maria
Gayde, Jean-Christophe
Kautzmann, Guillaume
Martino, Michele
Rodriguez, Jose
Siesling, Erwin
Valdarno, Luca
Venturini Delsolaro, Walter
author_facet Kadi, Yacine
Delruelle, Nicolas
Ferreira Somoza, Jose
Garcia Borge, Maria
Gayde, Jean-Christophe
Kautzmann, Guillaume
Martino, Michele
Rodriguez, Jose
Siesling, Erwin
Valdarno, Luca
Venturini Delsolaro, Walter
author_sort Kadi, Yacine
collection CERN
description After 20 years of successful ISOLDE operation at the PS-Booster*, a major upgrade of the facility, the HIE-ISOLDE (High Intensity and Energy ISOLDE) project was launched in 2010. It is divided into three parts; a staged upgrade of the REX post-accelerator to increase the beam energy from 3.3 MeV/u to 10 MeV/u using a super-conducting linac, an evaluation of the critical issues associated with an increase in proton-beam intensity and a machine design for an improvement in RIB quality. The latter two will be addressed within the HIE-ISOLDE Design Study. This presentation aims to provide an overview of the present status of the overall project by providing; an insight to the infrastructure modifications, installation and tests of the HEBT lines as well as progress on the commissioning of the SC linac. Plans for the second phase of the project will be highlighted.
id oai-inspirehep.net-1480508
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2016
record_format invenio
spelling oai-inspirehep.net-14805082019-09-30T06:29:59Zdoi:10.18429/JACoW-HIAT2015-MOM1I01http://cds.cern.ch/record/2265926engKadi, YacineDelruelle, NicolasFerreira Somoza, JoseGarcia Borge, MariaGayde, Jean-ChristopheKautzmann, GuillaumeMartino, MicheleRodriguez, JoseSiesling, ErwinValdarno, LucaVenturini Delsolaro, WalterProgress on the HIE-ISOLDE FacilityAccelerators and Storage RingsAfter 20 years of successful ISOLDE operation at the PS-Booster*, a major upgrade of the facility, the HIE-ISOLDE (High Intensity and Energy ISOLDE) project was launched in 2010. It is divided into three parts; a staged upgrade of the REX post-accelerator to increase the beam energy from 3.3 MeV/u to 10 MeV/u using a super-conducting linac, an evaluation of the critical issues associated with an increase in proton-beam intensity and a machine design for an improvement in RIB quality. The latter two will be addressed within the HIE-ISOLDE Design Study. This presentation aims to provide an overview of the present status of the overall project by providing; an insight to the infrastructure modifications, installation and tests of the HEBT lines as well as progress on the commissioning of the SC linac. Plans for the second phase of the project will be highlighted.oai:inspirehep.net:14805082016
spellingShingle Accelerators and Storage Rings
Kadi, Yacine
Delruelle, Nicolas
Ferreira Somoza, Jose
Garcia Borge, Maria
Gayde, Jean-Christophe
Kautzmann, Guillaume
Martino, Michele
Rodriguez, Jose
Siesling, Erwin
Valdarno, Luca
Venturini Delsolaro, Walter
Progress on the HIE-ISOLDE Facility
title Progress on the HIE-ISOLDE Facility
title_full Progress on the HIE-ISOLDE Facility
title_fullStr Progress on the HIE-ISOLDE Facility
title_full_unstemmed Progress on the HIE-ISOLDE Facility
title_short Progress on the HIE-ISOLDE Facility
title_sort progress on the hie-isolde facility
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-HIAT2015-MOM1I01
http://cds.cern.ch/record/2265926
work_keys_str_mv AT kadiyacine progressonthehieisoldefacility
AT delruellenicolas progressonthehieisoldefacility
AT ferreirasomozajose progressonthehieisoldefacility
AT garciaborgemaria progressonthehieisoldefacility
AT gaydejeanchristophe progressonthehieisoldefacility
AT kautzmannguillaume progressonthehieisoldefacility
AT martinomichele progressonthehieisoldefacility
AT rodriguezjose progressonthehieisoldefacility
AT sieslingerwin progressonthehieisoldefacility
AT valdarnoluca progressonthehieisoldefacility
AT venturinidelsolarowalter progressonthehieisoldefacility