Cargando…
Progress on the HIE-ISOLDE Facility
After 20 years of successful ISOLDE operation at the PS-Booster*, a major upgrade of the facility, the HIE-ISOLDE (High Intensity and Energy ISOLDE) project was launched in 2010. It is divided into three parts; a staged upgrade of the REX post-accelerator to increase the beam energy from 3.3 MeV/u t...
Autores principales: | Kadi, Yacine, Delruelle, Nicolas, Ferreira Somoza, Jose, Garcia Borge, Maria, Gayde, Jean-Christophe, Kautzmann, Guillaume, Martino, Michele, Rodriguez, Jose, Siesling, Erwin, Valdarno, Luca, Venturini Delsolaro, Walter |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-HIAT2015-MOM1I01 http://cds.cern.ch/record/2265926 |
Ejemplares similares
-
HIE-ISOLDE: First Commissioning Experience
por: Venturini Delsolaro, Walter, et al.
Publicado: (2016) -
Status of the SRF systems at HIE-ISOLDE
por: Venturini Delsolaro, Walter, et al.
Publicado: (2015) -
HIE-ISOLDE SC Linac progress and commissioning in 2016
por: Venturini Delsolaro, Walter, et al.
Publicado: (2017) -
HIE Isolde – General Presentation of MATHILDE
por: Kautzmann, Guillaume, et al.
Publicado: (2014) -
Status of the HIE-ISOLDE Linac
por: Venturini Delsolaro, Walter, et al.
Publicado: (2014)