Cargando…
Stretched-Wire Techniques and Measurements for the Alignment of a 15GHz RF-BPM for CLIC
For the Compact LInear Collider (CLIC) project at CERN, maintaining low emittance beams, as they are transported along the two independent 10-20 km long main linacs, is crucial. The beam trajectory therefore has to be very well aligned to the magnetic centre of the quadrupole magnets. A series of mi...
Autores principales: | Zorzetti, Silvia, Fanucci, Luca, Galindo Munoz, Natalia, Wendt, Manfred |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IBIC2015-TUPB063 http://cds.cern.ch/record/2263486 |
Ejemplares similares
-
Design of the 15 GHz BPM test bench for the CLIC test facility to perform precise stretchedwire RF measurements
por: Silvia Zorzetti, Silvia, et al.
Publicado: (2015) -
A Wire-Based Methodology to Analyse the Nanometric Resolution of an RF Cavity BPM
por: Zorzetti, Silvia, et al.
Publicado: (2017) -
Study of the Electrical Center of a Resonant Cavity Beam Position Monitor (RF-BPM) and Its Integration with the Main Beam Quadrupole for Alignment Purposes
por: Zorzetti, Silvia, et al.
Publicado: (2017) -
Electromagnetic Field Pre-alignment of the Compact Linear Collider (CLIC) Accelerating Structure with help of Wakefield Monitor Signals
por: Galindo Munoz, Natalia, et al.
Publicado: (2016) -
Submicron multi-bunch BPM for CLIC
por: Schmickler, H., et al.
Publicado: (2010)