Cargando…

Consolidations on the Vacuum Controls of the CERN Accelerators, During the First Long Shutdown of the LHC

For two years (Spring 2013 - Spring 2015), the LHC went through its first long shutdown (LS1). It was mainly motivated by the consolidation of magnet interconnects, to allow operation with 6.5 TeV proton beams. Moreover, around the accelerator complex, many other systems were repaired, consolidated...

Descripción completa

Detalles Bibliográficos
Autores principales: Gomes, Paulo, Antoniotti, Fabien, Aragon, Fernando, Bellorini, François, Blanchard, Sebastien, Boivin, Jean-Pierre, Chatzigeorgiou, Nikolaos, Daligault, Frederic, Ferreira, Rodrigo, Fraga, Jorge, Gama, Jose, Gutierrez, Abel, Kopylov, Leonid, Krakowski, Pawel, Merker, Sergey, Mikheev, Mikhail, Pereira, Helder, Pigny, Gregory, Prieto, Pablo, Rio, Benoit, Vestergard, Henrik
Lenguaje:eng
Publicado: 2015
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-ICALEPCS2015-MOPGF104
http://cds.cern.ch/record/2213474