Consolidations on the Vacuum Controls of the CERN Accelerators, During the First Long Shutdown of the LHC
For two years (Spring 2013 - Spring 2015), the LHC went through its first long shutdown (LS1). It was mainly motivated by the consolidation of magnet interconnects, to allow operation with 6.5 TeV proton beams. Moreover, around the accelerator complex, many other systems were repaired, consolidated...
Autores principales: | Gomes, Paulo, Antoniotti, Fabien, Aragon, Fernando, Bellorini, François, Blanchard, Sebastien, Boivin, Jean-Pierre, Chatzigeorgiou, Nikolaos, Daligault, Frederic, Ferreira, Rodrigo, Fraga, Jorge, Gama, Jose, Gutierrez, Abel, Kopylov, Leonid, Krakowski, Pawel, Merker, Sergey, Mikheev, Mikhail, Pereira, Helder, Pigny, Gregory, Prieto, Pablo, Rio, Benoit, Vestergard, Henrik |
---|---|
Lenguaje: | eng |
Publicado: |
2015
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-ICALEPCS2015-MOPGF104 http://cds.cern.ch/record/2213474 |
Ejemplares similares
-
The Control System of CERN Accelerators Vacuum (LS1 Activities and New Developments)
por: Gomes, P, et al.
Publicado: (2014) -
The Control System of CERN Accelerators Vacuum [LS1 Activities and New Developments]
por: Gomes, P, et al.
Publicado: (2014) -
Measurements, Alarms and Interlocks in the Vacuum Control System of the LHC
por: Pigny, Gregory, et al.
Publicado: (2015) -
Bake-Out Mobile Controls for Large Vacuum Systems
por: Blanchard, S, et al.
Publicado: (2014) -
Bake-out Mobile Controls for Large Vacuum Systems
por: Blanchard, S, et al.
Publicado: (2014)