Cargando…

Upgrades to the Infrastructure and Management of the Operator Workstations and Servers for Run 2 of the CERN Accelerator Complex

The Controls Group of the CERN Beams Department provides more than 400 operator workstations in the CERN Control Centre (CCC) and technical buildings of the accelerators, plus 300 servers in the server room (CCR) of the CCC. During the long shutdown of the accelerators that started in February 2013,...

Descripción completa

Detalles Bibliográficos
Autores principales: Bland, Alastair, Page, Stephen
Lenguaje:eng
Publicado: 2015
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-ICALEPCS2015-THHD3O08
http://cds.cern.ch/record/2213520
_version_ 1780952003206184960
author Bland, Alastair
Page, Stephen
author_facet Bland, Alastair
Page, Stephen
author_sort Bland, Alastair
collection CERN
description The Controls Group of the CERN Beams Department provides more than 400 operator workstations in the CERN Control Centre (CCC) and technical buildings of the accelerators, plus 300 servers in the server room (CCR) of the CCC. During the long shutdown of the accelerators that started in February 2013, many upgrades were done to improve this infrastructure in view of the higher-energy LHC run. The Engineering Department improved the electrical supply with fully redundant UPS, on-site diesel generators and for the CCR, water and air cooling systems. The Information Technology Department increased network bandwidth for the servers by a factor of 10 and introduced a pilot multicast service for the video streaming of the accelerator status displays and beam cameras. The Controls Group removed dependencies on network file systems for the operator accounts they manage for the Linacs, Booster, PS, ISOLDE, AD, CTF3, SPS, LHC and cryogenics. It also moved away from system administration based on shell scripts to using modern tools like version-controlled Ansible playbooks, which are now used for installation, day-to-day re-configuration and staged updates during technical stops.
id oai-inspirehep.net-1481752
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2015
record_format invenio
spelling oai-inspirehep.net-14817522019-09-30T06:29:59Zdoi:10.18429/JACoW-ICALEPCS2015-THHD3O08http://cds.cern.ch/record/2213520engBland, AlastairPage, StephenUpgrades to the Infrastructure and Management of the Operator Workstations and Servers for Run 2 of the CERN Accelerator ComplexAccelerators and Storage RingsThe Controls Group of the CERN Beams Department provides more than 400 operator workstations in the CERN Control Centre (CCC) and technical buildings of the accelerators, plus 300 servers in the server room (CCR) of the CCC. During the long shutdown of the accelerators that started in February 2013, many upgrades were done to improve this infrastructure in view of the higher-energy LHC run. The Engineering Department improved the electrical supply with fully redundant UPS, on-site diesel generators and for the CCR, water and air cooling systems. The Information Technology Department increased network bandwidth for the servers by a factor of 10 and introduced a pilot multicast service for the video streaming of the accelerator status displays and beam cameras. The Controls Group removed dependencies on network file systems for the operator accounts they manage for the Linacs, Booster, PS, ISOLDE, AD, CTF3, SPS, LHC and cryogenics. It also moved away from system administration based on shell scripts to using modern tools like version-controlled Ansible playbooks, which are now used for installation, day-to-day re-configuration and staged updates during technical stops.oai:inspirehep.net:14817522015
spellingShingle Accelerators and Storage Rings
Bland, Alastair
Page, Stephen
Upgrades to the Infrastructure and Management of the Operator Workstations and Servers for Run 2 of the CERN Accelerator Complex
title Upgrades to the Infrastructure and Management of the Operator Workstations and Servers for Run 2 of the CERN Accelerator Complex
title_full Upgrades to the Infrastructure and Management of the Operator Workstations and Servers for Run 2 of the CERN Accelerator Complex
title_fullStr Upgrades to the Infrastructure and Management of the Operator Workstations and Servers for Run 2 of the CERN Accelerator Complex
title_full_unstemmed Upgrades to the Infrastructure and Management of the Operator Workstations and Servers for Run 2 of the CERN Accelerator Complex
title_short Upgrades to the Infrastructure and Management of the Operator Workstations and Servers for Run 2 of the CERN Accelerator Complex
title_sort upgrades to the infrastructure and management of the operator workstations and servers for run 2 of the cern accelerator complex
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-ICALEPCS2015-THHD3O08
http://cds.cern.ch/record/2213520
work_keys_str_mv AT blandalastair upgradestotheinfrastructureandmanagementoftheoperatorworkstationsandserversforrun2ofthecernacceleratorcomplex
AT pagestephen upgradestotheinfrastructureandmanagementoftheoperatorworkstationsandserversforrun2ofthecernacceleratorcomplex