Cargando…
Status of the SRF systems at HIE-ISOLDE
The HIE-ISOLDE project has been approved by CERN in 2009 and gained momentum after 2011. The final energy goal of the upgrade is to boost the radioactive beams of REX-ISOLDE from the present 3 MeV/u up to 10 MeV/u for A/q up to 4.5. This is to be achieved by means of a new superconducting linac, ope...
Autores principales: | Venturini Delsolaro, Walter, Arnaudon, Luca, Artoos, Kurt, Bertone, Caterina, Bousquet, Jean-Alexandre, Delruelle, Nicolas, Elias, Michal, Ferreira Somoza, Jose, Formenti, Fabio, Gayde, Jean-Christophe, Grenard, Jean-Louis, Kadi, Yacine, Kautzmann, Guillaume, Leclercq, Yann, Mician, Matej, Miyazaki, Akira, Montesinos, Eric, Parma, Vittorio, Rosaz, Guillaume, Schirm, Karl, Siesling, Erwin, Sublet, Alban, Therasse, Mathieu, Valdarno, Luca, Valuch, Daniel, Vandoni, Giovanna, Williams, Lloyd, Zhang, Pei |
---|---|
Lenguaje: | eng |
Publicado: |
2015
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-SRF2015-TUBA01 http://cds.cern.ch/record/2288261 |
Ejemplares similares
-
Progress on the HIE-ISOLDE Facility
por: Kadi, Yacine, et al.
Publicado: (2016) -
HIE-ISOLDE: First Commissioning Experience
por: Venturini Delsolaro, Walter, et al.
Publicado: (2016) -
Status of the HIE-ISOLDE Linac
por: Venturini Delsolaro, Walter, et al.
Publicado: (2014) -
HIE-ISOLDE SC Linac progress and commissioning in 2016
por: Venturini Delsolaro, Walter, et al.
Publicado: (2017) -
Lessons learned from the HIE-Isolde cavity production and cryomodule commissioning
por: Venturini Delsolaro, Walter, et al.
Publicado: (2018)