Cargando…
First HIE-ISOLDE cryo-module assembly at CERN
The first phase of the HIE-ISOLDE project aims to increase the energy of the existing REX ISOLDE facilities from 3MeV/m to 5MeV/m. It involves the assembly of two superconducting cryo-modules based on quarter wave resonators made by niobium sputtered on copper. The first cryo-module was installed in...
Autores principales: | , , , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2015
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-SRF2015-TUPB106 http://cds.cern.ch/record/2288272 |
_version_ | 1780956153658736640 |
---|---|
author | Therasse, Mathieu Barlow, Graeme Bizzaglia, Sauro Bousquet, Jean-Alexandre Chrul, Anna Demarest, Paul Dequaire, Julien Deschamps, Jean-Baptiste Ferreira Somoza, Jose Gayde, Jean-Christophe Gourragne, Max Harrison, Anthony Kautzmann, Guillaume Mergelkuhl, Dirk Parma, Vittorio Struik, Michael Venturini Delsolaro, Walter Williams, Lloyd Zhang, Pei |
author_facet | Therasse, Mathieu Barlow, Graeme Bizzaglia, Sauro Bousquet, Jean-Alexandre Chrul, Anna Demarest, Paul Dequaire, Julien Deschamps, Jean-Baptiste Ferreira Somoza, Jose Gayde, Jean-Christophe Gourragne, Max Harrison, Anthony Kautzmann, Guillaume Mergelkuhl, Dirk Parma, Vittorio Struik, Michael Venturini Delsolaro, Walter Williams, Lloyd Zhang, Pei |
author_sort | Therasse, Mathieu |
collection | CERN |
description | The first phase of the HIE-ISOLDE project aims to increase the energy of the existing REX ISOLDE facilities from 3MeV/m to 5MeV/m. It involves the assembly of two superconducting cryo-modules based on quarter wave resonators made by niobium sputtered on copper. The first cryo-module was installed in the linac in May 2015 followed by the commissioning. The first beam is expected for September 2015. In parallel the second cryo-module assembly started. In this paper, we present the different aspects of these two cryo-modules including the assembly facilities and procedures, the quality assurance and the RF parameters (cavity performances, cavity tuning and coupling). |
id | oai-inspirehep.net-1482136 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2015 |
record_format | invenio |
spelling | oai-inspirehep.net-14821362019-10-15T15:28:53Zdoi:10.18429/JACoW-SRF2015-TUPB106http://cds.cern.ch/record/2288272engTherasse, MathieuBarlow, GraemeBizzaglia, SauroBousquet, Jean-AlexandreChrul, AnnaDemarest, PaulDequaire, JulienDeschamps, Jean-BaptisteFerreira Somoza, JoseGayde, Jean-ChristopheGourragne, MaxHarrison, AnthonyKautzmann, GuillaumeMergelkuhl, DirkParma, VittorioStruik, MichaelVenturini Delsolaro, WalterWilliams, LloydZhang, PeiFirst HIE-ISOLDE cryo-module assembly at CERNAccelerators and Storage RingsThe first phase of the HIE-ISOLDE project aims to increase the energy of the existing REX ISOLDE facilities from 3MeV/m to 5MeV/m. It involves the assembly of two superconducting cryo-modules based on quarter wave resonators made by niobium sputtered on copper. The first cryo-module was installed in the linac in May 2015 followed by the commissioning. The first beam is expected for September 2015. In parallel the second cryo-module assembly started. In this paper, we present the different aspects of these two cryo-modules including the assembly facilities and procedures, the quality assurance and the RF parameters (cavity performances, cavity tuning and coupling).oai:inspirehep.net:14821362015 |
spellingShingle | Accelerators and Storage Rings Therasse, Mathieu Barlow, Graeme Bizzaglia, Sauro Bousquet, Jean-Alexandre Chrul, Anna Demarest, Paul Dequaire, Julien Deschamps, Jean-Baptiste Ferreira Somoza, Jose Gayde, Jean-Christophe Gourragne, Max Harrison, Anthony Kautzmann, Guillaume Mergelkuhl, Dirk Parma, Vittorio Struik, Michael Venturini Delsolaro, Walter Williams, Lloyd Zhang, Pei First HIE-ISOLDE cryo-module assembly at CERN |
title | First HIE-ISOLDE cryo-module assembly at CERN |
title_full | First HIE-ISOLDE cryo-module assembly at CERN |
title_fullStr | First HIE-ISOLDE cryo-module assembly at CERN |
title_full_unstemmed | First HIE-ISOLDE cryo-module assembly at CERN |
title_short | First HIE-ISOLDE cryo-module assembly at CERN |
title_sort | first hie-isolde cryo-module assembly at cern |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-SRF2015-TUPB106 http://cds.cern.ch/record/2288272 |
work_keys_str_mv | AT therassemathieu firsthieisoldecryomoduleassemblyatcern AT barlowgraeme firsthieisoldecryomoduleassemblyatcern AT bizzagliasauro firsthieisoldecryomoduleassemblyatcern AT bousquetjeanalexandre firsthieisoldecryomoduleassemblyatcern AT chrulanna firsthieisoldecryomoduleassemblyatcern AT demarestpaul firsthieisoldecryomoduleassemblyatcern AT dequairejulien firsthieisoldecryomoduleassemblyatcern AT deschampsjeanbaptiste firsthieisoldecryomoduleassemblyatcern AT ferreirasomozajose firsthieisoldecryomoduleassemblyatcern AT gaydejeanchristophe firsthieisoldecryomoduleassemblyatcern AT gourragnemax firsthieisoldecryomoduleassemblyatcern AT harrisonanthony firsthieisoldecryomoduleassemblyatcern AT kautzmannguillaume firsthieisoldecryomoduleassemblyatcern AT mergelkuhldirk firsthieisoldecryomoduleassemblyatcern AT parmavittorio firsthieisoldecryomoduleassemblyatcern AT struikmichael firsthieisoldecryomoduleassemblyatcern AT venturinidelsolarowalter firsthieisoldecryomoduleassemblyatcern AT williamslloyd firsthieisoldecryomoduleassemblyatcern AT zhangpei firsthieisoldecryomoduleassemblyatcern |