Cargando…
Mechanical Performance of the LARP Nb$_3$Sn Quadrupole Magnet LQS01
As part of the effort towards the development of Nb$_3$Sn magnets for future LHC luminosity upgrades, the LHC Accelerator Research Program (LARP) has fabricated and tested the quadrupole magnet LQS01. The magnet implements 3.4 m long Nb$_3$Sn coils contained in a support structure characterized by a...
Autores principales: | , , , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/TASC.2010.2097571 http://cds.cern.ch/record/2773936 |
Sumario: | As part of the effort towards the development of Nb$_3$Sn magnets for future LHC luminosity upgrades, the LHC Accelerator Research Program (LARP) has fabricated and tested the quadrupole magnet LQS01. The magnet implements 3.4 m long Nb$_3$Sn coils contained in a support structure characterized by an external aluminum shell segmented in four sections. The room temperature pre-load of the structure is obtained by shimming load keys through bladders, pressurized during the loading operations and removed before cool-down. Temperature compensated strain gauges, mounted on structure components and coil poles, monitor the magnet's mechanical behavior during assembly, cool-down and, excitation. During the first test, LQS01 reached the target gradient of 200 T/m; the gauge data indicated that the aluminum shell was pre-tensioned to the target value estimated by numerical models, but a lack of pre-load was measured in the coil inner layer during ramping. As a result, the test was interrupted and the magnet disassembled, and inspected. A second test (LQS01b) was then carried out following a re-loading of the magnet. The paper reports on the strain gauge results of the first test and the analysis performed to identify corrective actions to improve the coil pre-stress distribution. The mechanical performance of the magnet during the second cool-down and test is then presented and discussed. |
---|