Cargando…
Operational performance of the CERN injector complex with transversely split beams
With the progress made in 2015, the beams produced by the CERN Proton Synchrotron using multiturn extraction (MTE) have been delivered to the Super Proton Synchrotron (SPS) for the fixed-target physics run. Operation successfully started in the second half of September 2015 and continued until the e...
Autores principales: | Abernethy, S, Akroh, A, Bartosik, H, Blas, A, Bohl, T, Cettour-Cave, S, Cornelis, K, Damerau, H, Gilardoni, S, Giovannozzi, M, Hernalsteens, C, Huschauer, A, Kain, V, Manglunki, D, Métral, G, Mikulec, B, Salvant, B, Sanchez Alvarez, J L, Steerenberg, R, Sterbini, G, Wu, Y |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1103/PhysRevAccelBeams.20.014001 http://cds.cern.ch/record/2270288 |
Ejemplares similares
-
Performance reach of the injector complex in 2012
por: Steerenberg, R, et al.
Publicado: (2012) -
Advancing the CERN proton synchrotron multiturn extraction towards the high-intensity proton beams frontier
por: Huschauer, A, et al.
Publicado: (2019) -
Performance reach of the injectors in 2011
por: Steerenberg, R, et al.
Publicado: (2011) -
LHC Injectors Complex Status
por: Hanke, K, et al.
Publicado: (2015) -
Ions for LHC: performance of the injector chain
por: Manglunki, D, et al.
Publicado: (2011)