Cargando…
Versatile transceiver production and quality assurance
The Versatile Link project has developed a radiation-hard optical link for LHC phase 1 detector upgrades. The project has reached its final stage and we have launched in 2016 the production of the Versatile Transceivers and Versatile Twin Transmitters. This paper provides an update of the production...
Autores principales: | , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1088/1748-0221/12/01/C01097 http://cds.cern.ch/record/2275007 |
Sumario: | The Versatile Link project has developed a radiation-hard optical link for LHC phase 1 detector upgrades. The project has reached its final stage and we have launched in 2016 the production of the Versatile Transceivers and Versatile Twin Transmitters. This paper provides an update of the production status and a detailed description and results of the quality assurance programme, which includes qualification and acceptance testing at CERN and production testing at the manufacturers' premises. |
---|