Cargando…

A serial powering pixel stave prototype for the ATLAS ITk upgrade

One of the main challenges for the ATLAS ITk Phase II Pixel upgrade is low-mass efficient power distribution for detector modules. This requires a powering scheme alternative to the parallel (direct) powering which is currently used. A serial powering scheme has been chosen as the baseline for the I...

Descripción completa

Detalles Bibliográficos
Autores principales: Filimonov, V, Gonella, L, Hügging, F, Kersten, S, Lehmann, N, Püllen, L, Wermes, N, Zeitnitz, C
Lenguaje:eng
Publicado: 2017
Materias:
Acceso en línea:https://dx.doi.org/10.1088/1748-0221/12/03/C03045
http://cds.cern.ch/record/2291121

Ejemplares similares