Cargando…
The Fast Interaction Trigger detector for the ALICE Upgrade
As a result of the LHC injectors upgrade after the Long Shutdown (2019-2020), the expected Pb-Pb luminosity and collision rate during the so called Runs 3 and 4 will considerably exceed the design parameters for several of the key ALICE detectors systems including the forward trigger detectors. Fast...
Autor principal: | Karavicheva, T L |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1088/1742-6596/798/1/012186 http://cds.cern.ch/record/2291443 |
Ejemplares similares
-
Status of Fast Interaction Trigger for ALICE Upgrade
por: Karavicheva, T L, et al.
Publicado: (2015) -
Status of the Fast Interaction Trigger detector for the ALICE upgrade
por: Rojas Torres, Solangel
Publicado: (2022) -
The Fast Interaction Trigger Upgrade for ALICE
por: Garcia-Solis, Edmundo
Publicado: (2016) -
The Fast Interaction Trigger for the ALICE Upgrade
por: Slupecki, Maciej
Publicado: (2020) -
Fast Interaction Trigger for ALICE upgrade
por: Slupecki, Maciej
Publicado: (2022)