Cargando…
LHC operation in 2015 and prospects for the future
In 2015 LHC started operation at a beam energy of 6.5 TeV. After a two month beam commissioning period, first collisions were delivered in June 2015. To reach nominal performance with a bunch spacing of 25 ns, the first main hurdle was the conditioning of the vacuum chamber to suppress the phenomeno...
Autor principal: | Wenninger, J |
---|---|
Lenguaje: | eng |
Publicado: |
ARISF
2016
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2263749 |
Ejemplares similares
-
Tune and Chromaticity Control During Snapback and Ramp in 2015 LHC Operation
por: Schaumann, Michaela, et al.
Publicado: (2016) -
Feed-Forward Corrections for Tune and Chromaticity Injection Decay During 2015 LHC Operation
por: Solfaroli Camillocci, Matteo, et al.
Publicado: (2016) -
The LHC nominal cycle, pre-cycle and variations in 2015
por: Wenninger, J, et al.
Publicado: (2014) -
Operation and Configuration of the LHC in Run 2
por: Wenninger, Jorg
Publicado: (2019) -
Have we been operating safely in 2015?
por: Wollmann, D, et al.
Publicado: (2016)