Cargando…
STF-2 Cryomodule Performance and New Input Coupler R&D; for ILC
The high power test for STF -2 cryomodule with twelve cavities has completed successfully in 2015. It became clear the average accelerating gradient was 30.3 MV/m, eight cavities achi eved above 31.5 MV/m as the ILC specification, and three cavities had the significant performance degradation by hea...
Autores principales: | , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
SISSA
2016
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.22323/1.282.0066 http://cds.cern.ch/record/2265889 |
_version_ | 1780954515222036480 |
---|---|
author | Yamamoto, Yasuchika Honma, Teruya Kako, Eiji Kojima, Yuuji Matsumoto, Toshihiro Michizono, Shinichiro Nakai, Hirotaka Shishido, Toshio Yamamoto, Akira Julie, Charles Montesinos, Eric |
author_facet | Yamamoto, Yasuchika Honma, Teruya Kako, Eiji Kojima, Yuuji Matsumoto, Toshihiro Michizono, Shinichiro Nakai, Hirotaka Shishido, Toshio Yamamoto, Akira Julie, Charles Montesinos, Eric |
author_sort | Yamamoto, Yasuchika |
collection | CERN |
description | The high power test for STF -2 cryomodule with twelve cavities has completed successfully in 2015. It became clear the average accelerating gradient was 30.3 MV/m, eight cavities achi eved above 31.5 MV/m as the ILC specification, and three cavities had the significant performance degradation by heavy field emission due to the additional clean room work in t he STF tunnel. As the following next steps, there are the LFD (Lorenz Force Detuning) measurem ent, LFD compensation by piezo, and long ru n for check of stable operation at high gradient. In th e long run around 32 MV/m, each cavity without degradation showed the stable operation with the successful LFD compensation by piezo and RF feedback system. On the other hand, from the view point of pl ug-compatibility for the input coupler in the ILC, new STF input couplers with 40mm of input port were re -designed, fabricated and high -power -tested successfully. Moreover, for the lower cost study, another input couplers with coating -free ceramic will be also tested soon in the collaboration of CERN and KEK. In this presentation, the detailed results for STF -2 Cryomodule t est and 40mm input couplers are reported. |
id | oai-inspirehep.net-1596429 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2016 |
publisher | SISSA |
record_format | invenio |
spelling | oai-inspirehep.net-15964292019-10-15T15:23:40Zdoi:10.22323/1.282.0066http://cds.cern.ch/record/2265889engYamamoto, YasuchikaHonma, TeruyaKako, EijiKojima, YuujiMatsumoto, ToshihiroMichizono, ShinichiroNakai, HirotakaShishido, ToshioYamamoto, AkiraJulie, CharlesMontesinos, EricSTF-2 Cryomodule Performance and New Input Coupler R&D; for ILCAccelerators and Storage RingsThe high power test for STF -2 cryomodule with twelve cavities has completed successfully in 2015. It became clear the average accelerating gradient was 30.3 MV/m, eight cavities achi eved above 31.5 MV/m as the ILC specification, and three cavities had the significant performance degradation by heavy field emission due to the additional clean room work in t he STF tunnel. As the following next steps, there are the LFD (Lorenz Force Detuning) measurem ent, LFD compensation by piezo, and long ru n for check of stable operation at high gradient. In th e long run around 32 MV/m, each cavity without degradation showed the stable operation with the successful LFD compensation by piezo and RF feedback system. On the other hand, from the view point of pl ug-compatibility for the input coupler in the ILC, new STF input couplers with 40mm of input port were re -designed, fabricated and high -power -tested successfully. Moreover, for the lower cost study, another input couplers with coating -free ceramic will be also tested soon in the collaboration of CERN and KEK. In this presentation, the detailed results for STF -2 Cryomodule t est and 40mm input couplers are reported.SISSAoai:inspirehep.net:15964292016 |
spellingShingle | Accelerators and Storage Rings Yamamoto, Yasuchika Honma, Teruya Kako, Eiji Kojima, Yuuji Matsumoto, Toshihiro Michizono, Shinichiro Nakai, Hirotaka Shishido, Toshio Yamamoto, Akira Julie, Charles Montesinos, Eric STF-2 Cryomodule Performance and New Input Coupler R&D; for ILC |
title | STF-2 Cryomodule Performance and New Input Coupler R&D; for ILC |
title_full | STF-2 Cryomodule Performance and New Input Coupler R&D; for ILC |
title_fullStr | STF-2 Cryomodule Performance and New Input Coupler R&D; for ILC |
title_full_unstemmed | STF-2 Cryomodule Performance and New Input Coupler R&D; for ILC |
title_short | STF-2 Cryomodule Performance and New Input Coupler R&D; for ILC |
title_sort | stf-2 cryomodule performance and new input coupler r&d; for ilc |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.22323/1.282.0066 http://cds.cern.ch/record/2265889 |
work_keys_str_mv | AT yamamotoyasuchika stf2cryomoduleperformanceandnewinputcouplerrdforilc AT honmateruya stf2cryomoduleperformanceandnewinputcouplerrdforilc AT kakoeiji stf2cryomoduleperformanceandnewinputcouplerrdforilc AT kojimayuuji stf2cryomoduleperformanceandnewinputcouplerrdforilc AT matsumototoshihiro stf2cryomoduleperformanceandnewinputcouplerrdforilc AT michizonoshinichiro stf2cryomoduleperformanceandnewinputcouplerrdforilc AT nakaihirotaka stf2cryomoduleperformanceandnewinputcouplerrdforilc AT shishidotoshio stf2cryomoduleperformanceandnewinputcouplerrdforilc AT yamamotoakira stf2cryomoduleperformanceandnewinputcouplerrdforilc AT juliecharles stf2cryomoduleperformanceandnewinputcouplerrdforilc AT montesinoseric stf2cryomoduleperformanceandnewinputcouplerrdforilc |