Cargando…
Direct Drive and Eddy Current Septa Magnet Designs for CERN's PSB Extraction at 2 GeV
In the framework of the LIU project, new septa magnets have been designed between CERN's PS booster (PSB) extraction and PS injection. The upgraded devices are to deal with the increased beam energy from 1.4 to 2 GeV at extraction of the PSB. The direct drive recombination septa in the PSB tran...
Autores principales: | Szoke, Z, Atanasov, M G, Balhan, B, Baud, C, Borburgh, J, Hourican, M, Masson, T, Prost, A |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/TASC.2016.2522189 http://cds.cern.ch/record/2266430 |
Ejemplares similares
-
Direct Drive and Eddy Current Septa Magnet Designs for CERN’s PSB Extraction at 2 GeV
por: Szoke, Zsolt, et al.
Publicado: (2015) -
Validation of the CERN PS Eddy Current Injection Septa
por: Hourican, Michael, et al.
Publicado: (2018) -
Design and Development of Separation Septa for the CERN PS Booster Upgrade
por: Hourican, M, et al.
Publicado: (2012) -
Final Results on the CERN PS Electrostatic Septa Consolidation Program
por: Borburgh, Jan, et al.
Publicado: (2003) -
Design and Construction of the LEIR Injection Septa
por: Borburgh, J, et al.
Publicado: (2005)