Constructing and Testing Data Models for LHC Electrical Quality Assurance
Constructing and testing various data models is a highly iterative and creative process. It requires the work of a team in an interdisciplinary way and a good understanding of the domain within which the models are developed. In this paper, we showed an approach for the construction and the estimati...
Autores principales: | Mertik, M, Bednarek, M J, Dahlerup-Petersen, K |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1520/JTE20150202 http://cds.cern.ch/record/2266903 |
Ejemplares similares
-
Electrical Quality Assurance of the Superconducting Circuits during LHC Machine Assembly
por: Bozzini, D, et al.
Publicado: (2008) -
Experience with the Quality Assurance of the Superconducting Electrical Circuits of the LHC Machine
por: Bozzini, D, et al.
Publicado: (2006) -
Design of an Automatic System for the Electrical Quality Assurance during the Assembly of the Electrical Circuits of the LHC
por: Bozzini, D, et al.
Publicado: (2004) -
Electrical quality assurance during installation of cryo-assemblies in the LHC tunnel
por: Siegel, N
Publicado: (2001) -
Preparation and Execution of the Electrical Quality Assurance Program On the LHC Superconducting Circuits During the Second Long Shutdown
por: Ludwin, Jaromir, et al.