Linac4: From Initial Design to Final Commissioning

This talk reviews the design, construction, and commissioning effort of CERN's new proton linear accelerator, Linac4, which has recently been commissioned and which is presently undergoing a reliability run. Linac4 will be connected to the LHC proton injector chain during the next long LHC shut...

Descripción completa

Detalles Bibliográficos
Autor principal: Lombardi, Alessandra
Lenguaje:eng
Publicado: 2017
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2017-TUYA1
http://cds.cern.ch/record/2289638
_version_ 1780956303815868416
author Lombardi, Alessandra
author_facet Lombardi, Alessandra
author_sort Lombardi, Alessandra
collection CERN
description This talk reviews the design, construction, and commissioning effort of CERN's new proton linear accelerator, Linac4, which has recently been commissioned and which is presently undergoing a reliability run. Linac4 will be connected to the LHC proton injector chain during the next long LHC shut down (LS2) and will then replace the ageing Linac2.
id oai-inspirehep.net-1626262
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2017
record_format invenio
spelling oai-inspirehep.net-16262622019-09-30T06:29:59Zdoi:10.18429/JACoW-IPAC2017-TUYA1http://cds.cern.ch/record/2289638engLombardi, AlessandraLinac4: From Initial Design to Final CommissioningAccelerators and Storage RingsThis talk reviews the design, construction, and commissioning effort of CERN's new proton linear accelerator, Linac4, which has recently been commissioned and which is presently undergoing a reliability run. Linac4 will be connected to the LHC proton injector chain during the next long LHC shut down (LS2) and will then replace the ageing Linac2.CERN-ACC-2017-191oai:inspirehep.net:16262622017
spellingShingle Accelerators and Storage Rings
Lombardi, Alessandra
Linac4: From Initial Design to Final Commissioning
title Linac4: From Initial Design to Final Commissioning
title_full Linac4: From Initial Design to Final Commissioning
title_fullStr Linac4: From Initial Design to Final Commissioning
title_full_unstemmed Linac4: From Initial Design to Final Commissioning
title_short Linac4: From Initial Design to Final Commissioning
title_sort linac4: from initial design to final commissioning
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-IPAC2017-TUYA1
http://cds.cern.ch/record/2289638
work_keys_str_mv AT lombardialessandra linac4frominitialdesigntofinalcommissioning