Linac4: From Initial Design to Final Commissioning
This talk reviews the design, construction, and commissioning effort of CERN's new proton linear accelerator, Linac4, which has recently been commissioned and which is presently undergoing a reliability run. Linac4 will be connected to the LHC proton injector chain during the next long LHC shut...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2017-TUYA1 http://cds.cern.ch/record/2289638 |
_version_ | 1780956303815868416 |
---|---|
author | Lombardi, Alessandra |
author_facet | Lombardi, Alessandra |
author_sort | Lombardi, Alessandra |
collection | CERN |
description | This talk reviews the design, construction, and commissioning effort of CERN's new proton linear accelerator, Linac4, which has recently been commissioned and which is presently undergoing a reliability run. Linac4 will be connected to the LHC proton injector chain during the next long LHC shut down (LS2) and will then replace the ageing Linac2. |
id | oai-inspirehep.net-1626262 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2017 |
record_format | invenio |
spelling | oai-inspirehep.net-16262622019-09-30T06:29:59Zdoi:10.18429/JACoW-IPAC2017-TUYA1http://cds.cern.ch/record/2289638engLombardi, AlessandraLinac4: From Initial Design to Final CommissioningAccelerators and Storage RingsThis talk reviews the design, construction, and commissioning effort of CERN's new proton linear accelerator, Linac4, which has recently been commissioned and which is presently undergoing a reliability run. Linac4 will be connected to the LHC proton injector chain during the next long LHC shut down (LS2) and will then replace the ageing Linac2.CERN-ACC-2017-191oai:inspirehep.net:16262622017 |
spellingShingle | Accelerators and Storage Rings Lombardi, Alessandra Linac4: From Initial Design to Final Commissioning |
title | Linac4: From Initial Design to Final Commissioning |
title_full | Linac4: From Initial Design to Final Commissioning |
title_fullStr | Linac4: From Initial Design to Final Commissioning |
title_full_unstemmed | Linac4: From Initial Design to Final Commissioning |
title_short | Linac4: From Initial Design to Final Commissioning |
title_sort | linac4: from initial design to final commissioning |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-IPAC2017-TUYA1 http://cds.cern.ch/record/2289638 |
work_keys_str_mv | AT lombardialessandra linac4frominitialdesigntofinalcommissioning |