Cargando…
Performance of the PS Injection Kicker System Short Circuit Mode Upgrade for Operation with 2 GeV LIU Beams
In the framework of the LHC Injector Upgrade (LIU) project an upgrade of the existing PS proton injection kicker system for 2 GeV operation is in progress. The upgrade is based on the operation of the existing kicker system in short circuit mode. This paper briefly reviews the deployed modifications...
Autores principales: | , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2017-WEPVA023 http://cds.cern.ch/record/2289665 |
_version_ | 1780956309606105088 |
---|---|
author | Kramer, Thomas Bartmann, Wolfgang Borburgh, Jan Ducimetière, Laurent Feliciano, Luis Ferrero Colomo, Alvaro Goddard, Brennan Sermeus, Luc |
author_facet | Kramer, Thomas Bartmann, Wolfgang Borburgh, Jan Ducimetière, Laurent Feliciano, Luis Ferrero Colomo, Alvaro Goddard, Brennan Sermeus, Luc |
author_sort | Kramer, Thomas |
collection | CERN |
description | In the framework of the LHC Injector Upgrade (LIU) project an upgrade of the existing PS proton injection kicker system for 2 GeV operation is in progress. The upgrade is based on the operation of the existing kicker system in short circuit mode. This paper briefly reviews the deployed modifications to the system to obtain the specified reduction of pulse reflections unavoidably induced by such a configuration. The implementation of improvements to the magnet entry box, transmission cables and the short circuit plug with integrated LC-filter are described as well as tests and measurements during the 2016/17 annual shutdown. The impact of the residual pulse shape structure on the beam performance for the reference LIU beam is quantified. The paper concludes with a performance analysis, a comparison of measurements vs. simulations and an outlook to the remaining modifications during the next long shut down. |
id | oai-inspirehep.net-1626303 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2017 |
record_format | invenio |
spelling | oai-inspirehep.net-16263032019-09-30T06:29:59Zdoi:10.18429/JACoW-IPAC2017-WEPVA023http://cds.cern.ch/record/2289665engKramer, ThomasBartmann, WolfgangBorburgh, JanDucimetière, LaurentFeliciano, LuisFerrero Colomo, AlvaroGoddard, BrennanSermeus, LucPerformance of the PS Injection Kicker System Short Circuit Mode Upgrade for Operation with 2 GeV LIU BeamsAccelerators and Storage RingsIn the framework of the LHC Injector Upgrade (LIU) project an upgrade of the existing PS proton injection kicker system for 2 GeV operation is in progress. The upgrade is based on the operation of the existing kicker system in short circuit mode. This paper briefly reviews the deployed modifications to the system to obtain the specified reduction of pulse reflections unavoidably induced by such a configuration. The implementation of improvements to the magnet entry box, transmission cables and the short circuit plug with integrated LC-filter are described as well as tests and measurements during the 2016/17 annual shutdown. The impact of the residual pulse shape structure on the beam performance for the reference LIU beam is quantified. The paper concludes with a performance analysis, a comparison of measurements vs. simulations and an outlook to the remaining modifications during the next long shut down.CERN-ACC-2017-164oai:inspirehep.net:16263032017 |
spellingShingle | Accelerators and Storage Rings Kramer, Thomas Bartmann, Wolfgang Borburgh, Jan Ducimetière, Laurent Feliciano, Luis Ferrero Colomo, Alvaro Goddard, Brennan Sermeus, Luc Performance of the PS Injection Kicker System Short Circuit Mode Upgrade for Operation with 2 GeV LIU Beams |
title | Performance of the PS Injection Kicker System Short Circuit Mode Upgrade for Operation with 2 GeV LIU Beams |
title_full | Performance of the PS Injection Kicker System Short Circuit Mode Upgrade for Operation with 2 GeV LIU Beams |
title_fullStr | Performance of the PS Injection Kicker System Short Circuit Mode Upgrade for Operation with 2 GeV LIU Beams |
title_full_unstemmed | Performance of the PS Injection Kicker System Short Circuit Mode Upgrade for Operation with 2 GeV LIU Beams |
title_short | Performance of the PS Injection Kicker System Short Circuit Mode Upgrade for Operation with 2 GeV LIU Beams |
title_sort | performance of the ps injection kicker system short circuit mode upgrade for operation with 2 gev liu beams |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-IPAC2017-WEPVA023 http://cds.cern.ch/record/2289665 |
work_keys_str_mv | AT kramerthomas performanceofthepsinjectionkickersystemshortcircuitmodeupgradeforoperationwith2gevliubeams AT bartmannwolfgang performanceofthepsinjectionkickersystemshortcircuitmodeupgradeforoperationwith2gevliubeams AT borburghjan performanceofthepsinjectionkickersystemshortcircuitmodeupgradeforoperationwith2gevliubeams AT ducimetierelaurent performanceofthepsinjectionkickersystemshortcircuitmodeupgradeforoperationwith2gevliubeams AT felicianoluis performanceofthepsinjectionkickersystemshortcircuitmodeupgradeforoperationwith2gevliubeams AT ferrerocolomoalvaro performanceofthepsinjectionkickersystemshortcircuitmodeupgradeforoperationwith2gevliubeams AT goddardbrennan performanceofthepsinjectionkickersystemshortcircuitmodeupgradeforoperationwith2gevliubeams AT sermeusluc performanceofthepsinjectionkickersystemshortcircuitmodeupgradeforoperationwith2gevliubeams |