Cargando…
Performance of the PS Injection Kicker System Short Circuit Mode Upgrade for Operation with 2 GeV LIU Beams
In the framework of the LHC Injector Upgrade (LIU) project an upgrade of the existing PS proton injection kicker system for 2 GeV operation is in progress. The upgrade is based on the operation of the existing kicker system in short circuit mode. This paper briefly reviews the deployed modifications...
Autores principales: | Kramer, Thomas, Bartmann, Wolfgang, Borburgh, Jan, Ducimetière, Laurent, Feliciano, Luis, Ferrero Colomo, Alvaro, Goddard, Brennan, Sermeus, Luc |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2017-WEPVA023 http://cds.cern.ch/record/2289665 |
Ejemplares similares
-
Feasibility Study of the PS Injection for 2 GeV LIU Beams with an Upgraded KFA-45 Injection Kicker System Operating in Short Circuit Mode
por: Kramer, Thomas, et al.
Publicado: (2016) -
Deployment and Commissioning of the CERN PS Injection Kicker System for Operation with 2 GeV Beams in Short Circuit Mode
por: Kramer, Thomas, et al.
Publicado: (2021) -
Beam-Based Waveform Measurements of the CERN PS Injection Kicker
por: Forte, Vincenzo, et al.
Publicado: (2017) -
Considerations on the Fast Pulsed Magnet Systems for the 2 GeV Beam Transfer from the CERN PSB to PS
por: Kramer, Thomas, et al.
Publicado: (2015) -
Performance Measurements and Analysis of Jitter Like Events for the PS Injection Kicker System
por: Ferrero Colomo, Alvaro, et al.
Publicado: (2018)