Cargando…

The SPS Beam Dump Facility

The proposed SPS beam dump facility (BDF) is a fixed-target facility foreseen to be situated at the North Area of the SPS. Beam dump in this context implies a target aimed at absorbing the majority of incident protons and containing most of the cascade generated by the primary beam interaction. The...

Descripción completa

Detalles Bibliográficos
Autores principales: Lamont, Mike, Arduini, Gianluigi, Battistin, Michele, Brugger, Markus, Calviani, Marco, Dos Santos Pedrosa, Fernando, Fraser, Matthew, Gatignon, Laurent, Gilardoni, Simone, Goddard, Brennan, Grenard, Jean-Louis, Heßler, Christoph, Jacobsson, Richard, Kain, Verena, Kershaw, Keith, Lopez Sola, Edmundo, Osborne, John, Perillo-Marcone, Antonio, Vincke, Heinz
Lenguaje:eng
Publicado: 2017
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2017-TUPVA126
http://cds.cern.ch/record/2289672
_version_ 1780956311062577152
author Lamont, Mike
Arduini, Gianluigi
Battistin, Michele
Brugger, Markus
Calviani, Marco
Dos Santos Pedrosa, Fernando
Fraser, Matthew
Gatignon, Laurent
Gilardoni, Simone
Goddard, Brennan
Grenard, Jean-Louis
Heßler, Christoph
Jacobsson, Richard
Kain, Verena
Kershaw, Keith
Lopez Sola, Edmundo
Osborne, John
Perillo-Marcone, Antonio
Vincke, Heinz
author_facet Lamont, Mike
Arduini, Gianluigi
Battistin, Michele
Brugger, Markus
Calviani, Marco
Dos Santos Pedrosa, Fernando
Fraser, Matthew
Gatignon, Laurent
Gilardoni, Simone
Goddard, Brennan
Grenard, Jean-Louis
Heßler, Christoph
Jacobsson, Richard
Kain, Verena
Kershaw, Keith
Lopez Sola, Edmundo
Osborne, John
Perillo-Marcone, Antonio
Vincke, Heinz
author_sort Lamont, Mike
collection CERN
description The proposed SPS beam dump facility (BDF) is a fixed-target facility foreseen to be situated at the North Area of the SPS. Beam dump in this context implies a target aimed at absorbing the majority of incident protons and containing most of the cascade generated by the primary beam interaction. The aim is a general purpose fixed target facility, which in the initial phase is aimed at the Search for Hidden Particles (SHiP) experiment. Feasibility studies are ongoing at CERN to address the key challenges of the facility. These challenges include: slow resonant extraction from the SPS; a target that has the two-fold objective of producing charged mesons as well as stopping the primary proton beam; and radiation protection considerations related to primary proton beam with a power of around 355 kW. The aim of the project is to complete the key technical feasibility studies in time for the European Strategy for Particle Physics (ESPP) update foreseen in 2020. This is in conjunction with the recommendation by the CERN Research Board to the SHiP experiment to prepare a comprehensive design study as input to the ESPP.
id oai-inspirehep.net-1626323
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2017
record_format invenio
spelling oai-inspirehep.net-16263232019-09-30T06:29:59Zdoi:10.18429/JACoW-IPAC2017-TUPVA126http://cds.cern.ch/record/2289672engLamont, MikeArduini, GianluigiBattistin, MicheleBrugger, MarkusCalviani, MarcoDos Santos Pedrosa, FernandoFraser, MatthewGatignon, LaurentGilardoni, SimoneGoddard, BrennanGrenard, Jean-LouisHeßler, ChristophJacobsson, RichardKain, VerenaKershaw, KeithLopez Sola, EdmundoOsborne, JohnPerillo-Marcone, AntonioVincke, HeinzThe SPS Beam Dump FacilityAccelerators and Storage RingsThe proposed SPS beam dump facility (BDF) is a fixed-target facility foreseen to be situated at the North Area of the SPS. Beam dump in this context implies a target aimed at absorbing the majority of incident protons and containing most of the cascade generated by the primary beam interaction. The aim is a general purpose fixed target facility, which in the initial phase is aimed at the Search for Hidden Particles (SHiP) experiment. Feasibility studies are ongoing at CERN to address the key challenges of the facility. These challenges include: slow resonant extraction from the SPS; a target that has the two-fold objective of producing charged mesons as well as stopping the primary proton beam; and radiation protection considerations related to primary proton beam with a power of around 355 kW. The aim of the project is to complete the key technical feasibility studies in time for the European Strategy for Particle Physics (ESPP) update foreseen in 2020. This is in conjunction with the recommendation by the CERN Research Board to the SHiP experiment to prepare a comprehensive design study as input to the ESPP.CERN-ACC-2017-157oai:inspirehep.net:16263232017
spellingShingle Accelerators and Storage Rings
Lamont, Mike
Arduini, Gianluigi
Battistin, Michele
Brugger, Markus
Calviani, Marco
Dos Santos Pedrosa, Fernando
Fraser, Matthew
Gatignon, Laurent
Gilardoni, Simone
Goddard, Brennan
Grenard, Jean-Louis
Heßler, Christoph
Jacobsson, Richard
Kain, Verena
Kershaw, Keith
Lopez Sola, Edmundo
Osborne, John
Perillo-Marcone, Antonio
Vincke, Heinz
The SPS Beam Dump Facility
title The SPS Beam Dump Facility
title_full The SPS Beam Dump Facility
title_fullStr The SPS Beam Dump Facility
title_full_unstemmed The SPS Beam Dump Facility
title_short The SPS Beam Dump Facility
title_sort sps beam dump facility
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-IPAC2017-TUPVA126
http://cds.cern.ch/record/2289672
work_keys_str_mv AT lamontmike thespsbeamdumpfacility
AT arduinigianluigi thespsbeamdumpfacility
AT battistinmichele thespsbeamdumpfacility
AT bruggermarkus thespsbeamdumpfacility
AT calvianimarco thespsbeamdumpfacility
AT dossantospedrosafernando thespsbeamdumpfacility
AT frasermatthew thespsbeamdumpfacility
AT gatignonlaurent thespsbeamdumpfacility
AT gilardonisimone thespsbeamdumpfacility
AT goddardbrennan thespsbeamdumpfacility
AT grenardjeanlouis thespsbeamdumpfacility
AT heßlerchristoph thespsbeamdumpfacility
AT jacobssonrichard thespsbeamdumpfacility
AT kainverena thespsbeamdumpfacility
AT kershawkeith thespsbeamdumpfacility
AT lopezsolaedmundo thespsbeamdumpfacility
AT osbornejohn thespsbeamdumpfacility
AT perillomarconeantonio thespsbeamdumpfacility
AT vinckeheinz thespsbeamdumpfacility
AT lamontmike spsbeamdumpfacility
AT arduinigianluigi spsbeamdumpfacility
AT battistinmichele spsbeamdumpfacility
AT bruggermarkus spsbeamdumpfacility
AT calvianimarco spsbeamdumpfacility
AT dossantospedrosafernando spsbeamdumpfacility
AT frasermatthew spsbeamdumpfacility
AT gatignonlaurent spsbeamdumpfacility
AT gilardonisimone spsbeamdumpfacility
AT goddardbrennan spsbeamdumpfacility
AT grenardjeanlouis spsbeamdumpfacility
AT heßlerchristoph spsbeamdumpfacility
AT jacobssonrichard spsbeamdumpfacility
AT kainverena spsbeamdumpfacility
AT kershawkeith spsbeamdumpfacility
AT lopezsolaedmundo spsbeamdumpfacility
AT osbornejohn spsbeamdumpfacility
AT perillomarconeantonio spsbeamdumpfacility
AT vinckeheinz spsbeamdumpfacility