Cargando…
HL-LHC Alignment Requirements and Associated Solutions
To increase by more than 10 times the luminosity reach w.r.t the first 10 years of the LHC lifetime, the HL-LHC project will replace nearly 1.2 km of the accelerator during the Long Shutdown 3 scheduled in 2024 [1][2][3]. This paper presents the HL-LHC alignment and internal metrology requirements o...
Autores principales: | , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2017-TUPIK085 http://cds.cern.ch/record/2289691 |
_version_ | 1780956315092254720 |
---|---|
author | Mainaud Durand, Helene Bartolome-Jimenez, Sonia Dijoud, Thibault Duquenne, Mathieu Herty, Andreas Rude, Vivien Sosin, Mateusz |
author_facet | Mainaud Durand, Helene Bartolome-Jimenez, Sonia Dijoud, Thibault Duquenne, Mathieu Herty, Andreas Rude, Vivien Sosin, Mateusz |
author_sort | Mainaud Durand, Helene |
collection | CERN |
description | To increase by more than 10 times the luminosity reach w.r.t the first 10 years of the LHC lifetime, the HL-LHC project will replace nearly 1.2 km of the accelerator during the Long Shutdown 3 scheduled in 2024 [1][2][3]. This paper presents the HL-LHC alignment and internal metrology requirements of all the new components to be installed, from the magnet components to the beam instrumentation and vacuum devices. As for the LHC, a combination of Hydrostatic Levelling Sensors (HLS) and Wire Positioning Sensors (WPS) is proposed for the alignment of the main components, but on a longer distance (210 m instead of 50 m), generating technical challenges for the installation of the stretched wire and for the maintenance of the alignment systems. Innovative measurements methods and instrumentation are under study to perform the position monitoring inside a cryostat of cold masses and crab cavities, in a cold (2K) and radioactive (1 MGy/year) environment, as well as to carry remote measurements in the tunnel of the intermediary components. The proposed solutions concerning the determination of the position and the re-adjustment of the components are detailed in this paper. |
id | oai-inspirehep.net-1626352 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2017 |
record_format | invenio |
spelling | oai-inspirehep.net-16263522019-09-30T06:29:59Zdoi:10.18429/JACoW-IPAC2017-TUPIK085http://cds.cern.ch/record/2289691engMainaud Durand, HeleneBartolome-Jimenez, SoniaDijoud, ThibaultDuquenne, MathieuHerty, AndreasRude, VivienSosin, MateuszHL-LHC Alignment Requirements and Associated SolutionsAccelerators and Storage RingsTo increase by more than 10 times the luminosity reach w.r.t the first 10 years of the LHC lifetime, the HL-LHC project will replace nearly 1.2 km of the accelerator during the Long Shutdown 3 scheduled in 2024 [1][2][3]. This paper presents the HL-LHC alignment and internal metrology requirements of all the new components to be installed, from the magnet components to the beam instrumentation and vacuum devices. As for the LHC, a combination of Hydrostatic Levelling Sensors (HLS) and Wire Positioning Sensors (WPS) is proposed for the alignment of the main components, but on a longer distance (210 m instead of 50 m), generating technical challenges for the installation of the stretched wire and for the maintenance of the alignment systems. Innovative measurements methods and instrumentation are under study to perform the position monitoring inside a cryostat of cold masses and crab cavities, in a cold (2K) and radioactive (1 MGy/year) environment, as well as to carry remote measurements in the tunnel of the intermediary components. The proposed solutions concerning the determination of the position and the re-adjustment of the components are detailed in this paper.CERN-ACC-2017-138oai:inspirehep.net:16263522017 |
spellingShingle | Accelerators and Storage Rings Mainaud Durand, Helene Bartolome-Jimenez, Sonia Dijoud, Thibault Duquenne, Mathieu Herty, Andreas Rude, Vivien Sosin, Mateusz HL-LHC Alignment Requirements and Associated Solutions |
title | HL-LHC Alignment Requirements and Associated Solutions |
title_full | HL-LHC Alignment Requirements and Associated Solutions |
title_fullStr | HL-LHC Alignment Requirements and Associated Solutions |
title_full_unstemmed | HL-LHC Alignment Requirements and Associated Solutions |
title_short | HL-LHC Alignment Requirements and Associated Solutions |
title_sort | hl-lhc alignment requirements and associated solutions |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-IPAC2017-TUPIK085 http://cds.cern.ch/record/2289691 |
work_keys_str_mv | AT mainauddurandhelene hllhcalignmentrequirementsandassociatedsolutions AT bartolomejimenezsonia hllhcalignmentrequirementsandassociatedsolutions AT dijoudthibault hllhcalignmentrequirementsandassociatedsolutions AT duquennemathieu hllhcalignmentrequirementsandassociatedsolutions AT hertyandreas hllhcalignmentrequirementsandassociatedsolutions AT rudevivien hllhcalignmentrequirementsandassociatedsolutions AT sosinmateusz hllhcalignmentrequirementsandassociatedsolutions |