Cargando…
HL-LHC Alignment Requirements and Associated Solutions
To increase by more than 10 times the luminosity reach w.r.t the first 10 years of the LHC lifetime, the HL-LHC project will replace nearly 1.2 km of the accelerator during the Long Shutdown 3 scheduled in 2024 [1][2][3]. This paper presents the HL-LHC alignment and internal metrology requirements o...
Autores principales: | Mainaud Durand, Helene, Bartolome-Jimenez, Sonia, Dijoud, Thibault, Duquenne, Mathieu, Herty, Andreas, Rude, Vivien, Sosin, Mateusz |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2017-TUPIK085 http://cds.cern.ch/record/2289691 |
Ejemplares similares
-
Frequency Scanning Interferometry as New Solution for on-Line Monitoring Inside a Cryostat for the HL-LHC project
por: Mainaud Durand, Helene, et al.
Publicado: (2018) -
Position Monitoring System for HL-LHC Crab Cavities
por: Sosin, Mateusz, et al.
Publicado: (2016) -
Alignment Methods Developed for the Validation of the Thermal and Mechanical Behaviour of the Two Beam Test Modules for the CLIC Project
por: Mainaud Durand, Helene, et al.
Publicado: (2014) -
Validation of the Crab-Cavities Internal Monitoring Strategy
por: Rude, V, et al.
Publicado: (2016) -
Drive Beam Quadrupoles for the CLIC Project: a Novel Method of Fiducialisation and a New Micrometric Adjustment System
por: Mainaud Durand, Helene, et al.
Publicado: (2014)