Cargando…
Final Results From the Clic Test Facility (CTF3)
The unique CLIC TEST Facility (CTF3) has been built more than a decade ago to demonstrate the feasibility of the CLIC two beam acceleration scheme. The emphasis was one the high current drive beam generation using a fully loaded highly efficient linac and a complex combination scheme to increase bea...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2017-TUZB1 http://cds.cern.ch/record/2289699 |
Sumario: | The unique CLIC TEST Facility (CTF3) has been built more than a decade ago to demonstrate the feasibility of the CLIC two beam acceleration scheme. The emphasis was one the high current drive beam generation using a fully loaded highly efficient linac and a complex combination scheme to increase beam current and bunch repetition frequency. This drive beam has been used for deceleration experiments and two beam acceleration. A wealth of relevant results for accelerator physics even beyond CLIC has been obtained and will be presented. The rf to beam efficiency of the linac exceeds 95%, after combination the 28 A drive beam with 12 GHz bunch repetition rate has been used to extract more than 50% of its energy producing 1.3 GW of 12 GHz power as well as performing two beam acceleration at 12 GHz with gradients up to 150 MV/m. |
---|