Cargando…

Final Results From the Clic Test Facility (CTF3)

The unique CLIC TEST Facility (CTF3) has been built more than a decade ago to demonstrate the feasibility of the CLIC two beam acceleration scheme. The emphasis was one the high current drive beam generation using a fully loaded highly efficient linac and a complex combination scheme to increase bea...

Descripción completa

Detalles Bibliográficos
Autor principal: Corsini, Roberto
Lenguaje:eng
Publicado: 2017
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2017-TUZB1
http://cds.cern.ch/record/2289699
Descripción
Sumario:The unique CLIC TEST Facility (CTF3) has been built more than a decade ago to demonstrate the feasibility of the CLIC two beam acceleration scheme. The emphasis was one the high current drive beam generation using a fully loaded highly efficient linac and a complex combination scheme to increase beam current and bunch repetition frequency. This drive beam has been used for deceleration experiments and two beam acceleration. A wealth of relevant results for accelerator physics even beyond CLIC has been obtained and will be presented. The rf to beam efficiency of the linac exceeds 95%, after combination the 28 A drive beam with 12 GHz bunch repetition rate has been used to extract more than 50% of its energy producing 1.3 GW of 12 GHz power as well as performing two beam acceleration at 12 GHz with gradients up to 150 MV/m.