Cargando…
Final Results From the Clic Test Facility (CTF3)
The unique CLIC TEST Facility (CTF3) has been built more than a decade ago to demonstrate the feasibility of the CLIC two beam acceleration scheme. The emphasis was one the high current drive beam generation using a fully loaded highly efficient linac and a complex combination scheme to increase bea...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2017-TUZB1 http://cds.cern.ch/record/2289699 |
_version_ | 1780956316812967936 |
---|---|
author | Corsini, Roberto |
author_facet | Corsini, Roberto |
author_sort | Corsini, Roberto |
collection | CERN |
description | The unique CLIC TEST Facility (CTF3) has been built more than a decade ago to demonstrate the feasibility of the CLIC two beam acceleration scheme. The emphasis was one the high current drive beam generation using a fully loaded highly efficient linac and a complex combination scheme to increase beam current and bunch repetition frequency. This drive beam has been used for deceleration experiments and two beam acceleration. A wealth of relevant results for accelerator physics even beyond CLIC has been obtained and will be presented. The rf to beam efficiency of the linac exceeds 95%, after combination the 28 A drive beam with 12 GHz bunch repetition rate has been used to extract more than 50% of its energy producing 1.3 GW of 12 GHz power as well as performing two beam acceleration at 12 GHz with gradients up to 150 MV/m. |
id | oai-inspirehep.net-1626362 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2017 |
record_format | invenio |
spelling | oai-inspirehep.net-16263622023-07-20T15:01:41Zdoi:10.18429/JACoW-IPAC2017-TUZB1http://cds.cern.ch/record/2289699engCorsini, RobertoFinal Results From the Clic Test Facility (CTF3)Accelerators and Storage RingsThe unique CLIC TEST Facility (CTF3) has been built more than a decade ago to demonstrate the feasibility of the CLIC two beam acceleration scheme. The emphasis was one the high current drive beam generation using a fully loaded highly efficient linac and a complex combination scheme to increase beam current and bunch repetition frequency. This drive beam has been used for deceleration experiments and two beam acceleration. A wealth of relevant results for accelerator physics even beyond CLIC has been obtained and will be presented. The rf to beam efficiency of the linac exceeds 95%, after combination the 28 A drive beam with 12 GHz bunch repetition rate has been used to extract more than 50% of its energy producing 1.3 GW of 12 GHz power as well as performing two beam acceleration at 12 GHz with gradients up to 150 MV/m.CERN-ACC-2017-130CLIC-Note-1113oai:inspirehep.net:16263622017 |
spellingShingle | Accelerators and Storage Rings Corsini, Roberto Final Results From the Clic Test Facility (CTF3) |
title | Final Results From the Clic Test Facility (CTF3) |
title_full | Final Results From the Clic Test Facility (CTF3) |
title_fullStr | Final Results From the Clic Test Facility (CTF3) |
title_full_unstemmed | Final Results From the Clic Test Facility (CTF3) |
title_short | Final Results From the Clic Test Facility (CTF3) |
title_sort | final results from the clic test facility (ctf3) |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-IPAC2017-TUZB1 http://cds.cern.ch/record/2289699 |
work_keys_str_mv | AT corsiniroberto finalresultsfromtheclictestfacilityctf3 |