Final Results From the Clic Test Facility (CTF3)

The unique CLIC TEST Facility (CTF3) has been built more than a decade ago to demonstrate the feasibility of the CLIC two beam acceleration scheme. The emphasis was one the high current drive beam generation using a fully loaded highly efficient linac and a complex combination scheme to increase bea...

Descripción completa

Detalles Bibliográficos
Autor principal: Corsini, Roberto
Lenguaje:eng
Publicado: 2017
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2017-TUZB1