Cargando…

The CLIC Main Linac Module Updated Design

In 2016, CLIC implementation working groups have started their reflection on how to finalize the CLIC design work in the different areas of the project, aiming for a technical design and an overall implementation plan for CLIC being available for the next European Strategy Update around 2019. One of...

Descripción completa

Detalles Bibliográficos
Autores principales: Rossi, Carlo, Aicheler, Markus, Catalán Lasheras, Nuria, Corsini, Roberto, Döbert, Steffen, Grudiev, Alexej, Latina, Andrea, Mainaud Durand, Helene, Modena, Michele, Schmickler, Hermann, Schulte, Daniel, Stapnes, Steinar, Syratchev, Igor, Vamvakas, Alexios, Wuensch, Walter
Lenguaje:eng
Publicado: 2017
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2017-TUPAB016
http://cds.cern.ch/record/2289701
Descripción
Sumario:In 2016, CLIC implementation working groups have started their reflection on how to finalize the CLIC design work in the different areas of the project, aiming for a technical design and an overall implementation plan for CLIC being available for the next European Strategy Update around 2019. One of the working groups has focused its attention on the Main Linac hardware, which has brought together the different competences of the study with the aim of producing an advanced set of specifications for the design, installation and operation of the CLIC module. As the fundamental unit for the construction of the Main Beam linac, the CLIC module needs to move from the existing prototypes exploring its performance into an advanced and functional unit where the full life cycle of the module is considered. The progress of the working group activity is summarized in this paper, with considerations on the requirements for the design of the next-phase CLIC module.