Beam Instrumentation for the CERN LINAC4 and PSB Half Sector Test
The construction, installation and initial commissioning of CERN's LINAC4 was completed in 2016 with H⁻ ions successfully accelerated to its top energy of 160 MeV. The accelerator is equipped with a large number of beam diagnostic systems that are essential to monitor, control and optimize the...