Cargando…
Beam Instrumentation for the CERN LINAC4 and PSB Half Sector Test
The construction, installation and initial commissioning of CERN's LINAC4 was completed in 2016 with H⁻ ions successfully accelerated to its top energy of 160 MeV. The accelerator is equipped with a large number of beam diagnostic systems that are essential to monitor, control and optimize the...
Autores principales: | Roncarolo, Federico, Allica Santamaria, Juan, Bozzolan, Michele, Bracco, Chiara, Burger, Stephane, Focker, Gerrit Jan, Guidoboni, Greta, Hofmann, Thomas, Jensen, Lars, Mikulec, Bettina, Navarro Fernandez, Araceli, Raich, Uli, Ruiz, Julien-Benjamin, Søby, Lars, Tan, Jocelyn, Viganò, William, Vuitton, Christophe, Zamantzas, Christos |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2017-MOPAB120 http://cds.cern.ch/record/2289702 |
Ejemplares similares
-
Commissioning of the Beam Instrumentation for the Half Sector Test in Linac4 with a 160 MeV H⁻ Beam
por: Guidoboni, Greta, et al.
Publicado: (2018) -
Commissioning and Results of the Half-Sector Test Installation with 160 MeV H⁻ beam from Linac4
por: Mikulec, Bettina, et al.
Publicado: (2017) -
Beam Diagnostics Measurements at 3MeV of the LINAC4 $H^{−}$ Beam at CERN
por: Zocca, Francesca, et al.
Publicado: (2014) -
Overview of the CERN Linac4 beam instrumentation
por: Roncarolo, F, et al.
Publicado: (2010) -
Commissioning of the Stripping Foil Units for the Upgrade of the PSB H⁻ Injection System
por: Bracco, Chiara, et al.
Publicado: (2017)