Commissioning and Results of the Half-Sector Test Installation with 160 MeV H⁻ beam from Linac4

During the Long Shutdown 2 (LS2) at CERN in 2019/20, the Proton Synchrotron Booster (PSB) will undergo a profound upgrade in the framework of the LHC Injector Upgrade (LIU) project involving also the connection to the new Linac4 injector. The 160 MeV Linac4 H' injection entails a complete repla...

Descripción completa

Detalles Bibliográficos
Autores principales: Mikulec, Bettina, Aguglia, Davide, Allica Santamaria, Juan, Baud, Cedric, Bracco, Chiara, Burger, Stephane, Guidoboni, Greta, Jorat, Louise Olivia, Martin, Christophe, Navarro Fernandez, Araceli, Noulibos, Remy, Roncarolo, Federico, Sanchez Alvarez, Jose-Luis, Tan, Jocelyn, Todorcevic, Todor, Van Trappen, Pieter, Weterings, Wim, Zamantzas, Christos
Lenguaje:eng
Publicado: 2017
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2017-MOPIK047
http://cds.cern.ch/record/2289129
Descripción
Sumario:During the Long Shutdown 2 (LS2) at CERN in 2019/20, the Proton Synchrotron Booster (PSB) will undergo a profound upgrade in the framework of the LHC Injector Upgrade (LIU) project involving also the connection to the new Linac4 injector. The 160 MeV Linac4 H' injection entails a complete replacement of the PSB injection section, including a stripping foil system, injection chicane, an H⁰/H' dump and novel beam instrumentation. The equivalent of half of this new injection chicane was temporarily installed in the Linac4 transfer line to evaluate the performance of the equipment and prepare controls, interlocks and applications for the connection. Outcomes of this so-called Half-Sector Test (HST) are presented in this paper.