Commissioning and Results of the Half-Sector Test Installation with 160 MeV H⁻ beam from Linac4

During the Long Shutdown 2 (LS2) at CERN in 2019/20, the Proton Synchrotron Booster (PSB) will undergo a profound upgrade in the framework of the LHC Injector Upgrade (LIU) project involving also the connection to the new Linac4 injector. The 160 MeV Linac4 H' injection entails a complete repla...

Descripción completa

Detalles Bibliográficos
Autores principales: Mikulec, Bettina, Aguglia, Davide, Allica Santamaria, Juan, Baud, Cedric, Bracco, Chiara, Burger, Stephane, Guidoboni, Greta, Jorat, Louise Olivia, Martin, Christophe, Navarro Fernandez, Araceli, Noulibos, Remy, Roncarolo, Federico, Sanchez Alvarez, Jose-Luis, Tan, Jocelyn, Todorcevic, Todor, Van Trappen, Pieter, Weterings, Wim, Zamantzas, Christos
Lenguaje:eng
Publicado: 2017
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2017-MOPIK047
http://cds.cern.ch/record/2289129
_version_ 1780956329619226624
author Mikulec, Bettina
Aguglia, Davide
Allica Santamaria, Juan
Baud, Cedric
Bracco, Chiara
Burger, Stephane
Guidoboni, Greta
Jorat, Louise Olivia
Martin, Christophe
Navarro Fernandez, Araceli
Noulibos, Remy
Roncarolo, Federico
Sanchez Alvarez, Jose-Luis
Tan, Jocelyn
Todorcevic, Todor
Van Trappen, Pieter
Weterings, Wim
Zamantzas, Christos
author_facet Mikulec, Bettina
Aguglia, Davide
Allica Santamaria, Juan
Baud, Cedric
Bracco, Chiara
Burger, Stephane
Guidoboni, Greta
Jorat, Louise Olivia
Martin, Christophe
Navarro Fernandez, Araceli
Noulibos, Remy
Roncarolo, Federico
Sanchez Alvarez, Jose-Luis
Tan, Jocelyn
Todorcevic, Todor
Van Trappen, Pieter
Weterings, Wim
Zamantzas, Christos
author_sort Mikulec, Bettina
collection CERN
description During the Long Shutdown 2 (LS2) at CERN in 2019/20, the Proton Synchrotron Booster (PSB) will undergo a profound upgrade in the framework of the LHC Injector Upgrade (LIU) project involving also the connection to the new Linac4 injector. The 160 MeV Linac4 H' injection entails a complete replacement of the PSB injection section, including a stripping foil system, injection chicane, an H⁰/H' dump and novel beam instrumentation. The equivalent of half of this new injection chicane was temporarily installed in the Linac4 transfer line to evaluate the performance of the equipment and prepare controls, interlocks and applications for the connection. Outcomes of this so-called Half-Sector Test (HST) are presented in this paper.
id oai-inspirehep.net-1626523
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2017
record_format invenio
spelling oai-inspirehep.net-16265232019-09-30T06:29:59Zdoi:10.18429/JACoW-IPAC2017-MOPIK047http://cds.cern.ch/record/2289129engMikulec, BettinaAguglia, DavideAllica Santamaria, JuanBaud, CedricBracco, ChiaraBurger, StephaneGuidoboni, GretaJorat, Louise OliviaMartin, ChristopheNavarro Fernandez, AraceliNoulibos, RemyRoncarolo, FedericoSanchez Alvarez, Jose-LuisTan, JocelynTodorcevic, TodorVan Trappen, PieterWeterings, WimZamantzas, ChristosCommissioning and Results of the Half-Sector Test Installation with 160 MeV H⁻ beam from Linac4Accelerators and Storage RingsDuring the Long Shutdown 2 (LS2) at CERN in 2019/20, the Proton Synchrotron Booster (PSB) will undergo a profound upgrade in the framework of the LHC Injector Upgrade (LIU) project involving also the connection to the new Linac4 injector. The 160 MeV Linac4 H' injection entails a complete replacement of the PSB injection section, including a stripping foil system, injection chicane, an H⁰/H' dump and novel beam instrumentation. The equivalent of half of this new injection chicane was temporarily installed in the Linac4 transfer line to evaluate the performance of the equipment and prepare controls, interlocks and applications for the connection. Outcomes of this so-called Half-Sector Test (HST) are presented in this paper.CERN-ACC-2017-276oai:inspirehep.net:16265232017
spellingShingle Accelerators and Storage Rings
Mikulec, Bettina
Aguglia, Davide
Allica Santamaria, Juan
Baud, Cedric
Bracco, Chiara
Burger, Stephane
Guidoboni, Greta
Jorat, Louise Olivia
Martin, Christophe
Navarro Fernandez, Araceli
Noulibos, Remy
Roncarolo, Federico
Sanchez Alvarez, Jose-Luis
Tan, Jocelyn
Todorcevic, Todor
Van Trappen, Pieter
Weterings, Wim
Zamantzas, Christos
Commissioning and Results of the Half-Sector Test Installation with 160 MeV H⁻ beam from Linac4
title Commissioning and Results of the Half-Sector Test Installation with 160 MeV H⁻ beam from Linac4
title_full Commissioning and Results of the Half-Sector Test Installation with 160 MeV H⁻ beam from Linac4
title_fullStr Commissioning and Results of the Half-Sector Test Installation with 160 MeV H⁻ beam from Linac4
title_full_unstemmed Commissioning and Results of the Half-Sector Test Installation with 160 MeV H⁻ beam from Linac4
title_short Commissioning and Results of the Half-Sector Test Installation with 160 MeV H⁻ beam from Linac4
title_sort commissioning and results of the half-sector test installation with 160 mev h⁻ beam from linac4
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-IPAC2017-MOPIK047
http://cds.cern.ch/record/2289129
work_keys_str_mv AT mikulecbettina commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4
AT agugliadavide commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4
AT allicasantamariajuan commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4
AT baudcedric commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4
AT braccochiara commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4
AT burgerstephane commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4
AT guidobonigreta commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4
AT joratlouiseolivia commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4
AT martinchristophe commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4
AT navarrofernandezaraceli commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4
AT noulibosremy commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4
AT roncarolofederico commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4
AT sanchezalvarezjoseluis commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4
AT tanjocelyn commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4
AT todorcevictodor commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4
AT vantrappenpieter commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4
AT weteringswim commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4
AT zamantzaschristos commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4