Commissioning and Results of the Half-Sector Test Installation with 160 MeV H⁻ beam from Linac4
During the Long Shutdown 2 (LS2) at CERN in 2019/20, the Proton Synchrotron Booster (PSB) will undergo a profound upgrade in the framework of the LHC Injector Upgrade (LIU) project involving also the connection to the new Linac4 injector. The 160 MeV Linac4 H' injection entails a complete repla...
Autores principales: | , , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2017-MOPIK047 http://cds.cern.ch/record/2289129 |
_version_ | 1780956329619226624 |
---|---|
author | Mikulec, Bettina Aguglia, Davide Allica Santamaria, Juan Baud, Cedric Bracco, Chiara Burger, Stephane Guidoboni, Greta Jorat, Louise Olivia Martin, Christophe Navarro Fernandez, Araceli Noulibos, Remy Roncarolo, Federico Sanchez Alvarez, Jose-Luis Tan, Jocelyn Todorcevic, Todor Van Trappen, Pieter Weterings, Wim Zamantzas, Christos |
author_facet | Mikulec, Bettina Aguglia, Davide Allica Santamaria, Juan Baud, Cedric Bracco, Chiara Burger, Stephane Guidoboni, Greta Jorat, Louise Olivia Martin, Christophe Navarro Fernandez, Araceli Noulibos, Remy Roncarolo, Federico Sanchez Alvarez, Jose-Luis Tan, Jocelyn Todorcevic, Todor Van Trappen, Pieter Weterings, Wim Zamantzas, Christos |
author_sort | Mikulec, Bettina |
collection | CERN |
description | During the Long Shutdown 2 (LS2) at CERN in 2019/20, the Proton Synchrotron Booster (PSB) will undergo a profound upgrade in the framework of the LHC Injector Upgrade (LIU) project involving also the connection to the new Linac4 injector. The 160 MeV Linac4 H' injection entails a complete replacement of the PSB injection section, including a stripping foil system, injection chicane, an H⁰/H' dump and novel beam instrumentation. The equivalent of half of this new injection chicane was temporarily installed in the Linac4 transfer line to evaluate the performance of the equipment and prepare controls, interlocks and applications for the connection. Outcomes of this so-called Half-Sector Test (HST) are presented in this paper. |
id | oai-inspirehep.net-1626523 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2017 |
record_format | invenio |
spelling | oai-inspirehep.net-16265232019-09-30T06:29:59Zdoi:10.18429/JACoW-IPAC2017-MOPIK047http://cds.cern.ch/record/2289129engMikulec, BettinaAguglia, DavideAllica Santamaria, JuanBaud, CedricBracco, ChiaraBurger, StephaneGuidoboni, GretaJorat, Louise OliviaMartin, ChristopheNavarro Fernandez, AraceliNoulibos, RemyRoncarolo, FedericoSanchez Alvarez, Jose-LuisTan, JocelynTodorcevic, TodorVan Trappen, PieterWeterings, WimZamantzas, ChristosCommissioning and Results of the Half-Sector Test Installation with 160 MeV H⁻ beam from Linac4Accelerators and Storage RingsDuring the Long Shutdown 2 (LS2) at CERN in 2019/20, the Proton Synchrotron Booster (PSB) will undergo a profound upgrade in the framework of the LHC Injector Upgrade (LIU) project involving also the connection to the new Linac4 injector. The 160 MeV Linac4 H' injection entails a complete replacement of the PSB injection section, including a stripping foil system, injection chicane, an H⁰/H' dump and novel beam instrumentation. The equivalent of half of this new injection chicane was temporarily installed in the Linac4 transfer line to evaluate the performance of the equipment and prepare controls, interlocks and applications for the connection. Outcomes of this so-called Half-Sector Test (HST) are presented in this paper.CERN-ACC-2017-276oai:inspirehep.net:16265232017 |
spellingShingle | Accelerators and Storage Rings Mikulec, Bettina Aguglia, Davide Allica Santamaria, Juan Baud, Cedric Bracco, Chiara Burger, Stephane Guidoboni, Greta Jorat, Louise Olivia Martin, Christophe Navarro Fernandez, Araceli Noulibos, Remy Roncarolo, Federico Sanchez Alvarez, Jose-Luis Tan, Jocelyn Todorcevic, Todor Van Trappen, Pieter Weterings, Wim Zamantzas, Christos Commissioning and Results of the Half-Sector Test Installation with 160 MeV H⁻ beam from Linac4 |
title | Commissioning and Results of the Half-Sector Test Installation with 160 MeV H⁻ beam from Linac4 |
title_full | Commissioning and Results of the Half-Sector Test Installation with 160 MeV H⁻ beam from Linac4 |
title_fullStr | Commissioning and Results of the Half-Sector Test Installation with 160 MeV H⁻ beam from Linac4 |
title_full_unstemmed | Commissioning and Results of the Half-Sector Test Installation with 160 MeV H⁻ beam from Linac4 |
title_short | Commissioning and Results of the Half-Sector Test Installation with 160 MeV H⁻ beam from Linac4 |
title_sort | commissioning and results of the half-sector test installation with 160 mev h⁻ beam from linac4 |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-IPAC2017-MOPIK047 http://cds.cern.ch/record/2289129 |
work_keys_str_mv | AT mikulecbettina commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4 AT agugliadavide commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4 AT allicasantamariajuan commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4 AT baudcedric commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4 AT braccochiara commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4 AT burgerstephane commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4 AT guidobonigreta commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4 AT joratlouiseolivia commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4 AT martinchristophe commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4 AT navarrofernandezaraceli commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4 AT noulibosremy commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4 AT roncarolofederico commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4 AT sanchezalvarezjoseluis commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4 AT tanjocelyn commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4 AT todorcevictodor commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4 AT vantrappenpieter commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4 AT weteringswim commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4 AT zamantzaschristos commissioningandresultsofthehalfsectortestinstallationwith160mevhbeamfromlinac4 |