Commissioning and Results of the Half-Sector Test Installation with 160 MeV H⁻ beam from Linac4
During the Long Shutdown 2 (LS2) at CERN in 2019/20, the Proton Synchrotron Booster (PSB) will undergo a profound upgrade in the framework of the LHC Injector Upgrade (LIU) project involving also the connection to the new Linac4 injector. The 160 MeV Linac4 H' injection entails a complete repla...
Autores principales: | Mikulec, Bettina, Aguglia, Davide, Allica Santamaria, Juan, Baud, Cedric, Bracco, Chiara, Burger, Stephane, Guidoboni, Greta, Jorat, Louise Olivia, Martin, Christophe, Navarro Fernandez, Araceli, Noulibos, Remy, Roncarolo, Federico, Sanchez Alvarez, Jose-Luis, Tan, Jocelyn, Todorcevic, Todor, Van Trappen, Pieter, Weterings, Wim, Zamantzas, Christos |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2017-MOPIK047 http://cds.cern.ch/record/2289129 |
Ejemplares similares
-
Commissioning of the Beam Instrumentation for the Half Sector Test in Linac4 with a 160 MeV H⁻ Beam
por: Guidoboni, Greta, et al.
Publicado: (2018) -
First experience with carbon stripping foils for the 160 MeV H− injection into the CERN PSB
por: Weterings, Wim, et al.
Publicado: (2018) -
Commissioning of the Stripping Foil Units for the Upgrade of the PSB H⁻ Injection System
por: Bracco, Chiara, et al.
Publicado: (2017) -
Status of the 160 MeV H- Injection into the CERN PSB
por: Weterings, W, et al.
Publicado: (2012) -
Beam Commissioning of the New 160 MeV H⁻ Injection System of the CERN PS Booster
por: Renner, Elisabeth, et al.
Publicado: (2021)