ELENA - From Installation to Commissioning
ELENA (Extra Low ENergy Antiproton ring) is an upgrade project at the CERN AD (Antiproton Decelerator). The smaller ELENA ring will further decelerate 5.3 MeV antiprotons from the AD ring down to 100 keV using electron cooling to obtain good deceleration efficiency and dense beams. An increase of up...
Autores principales: | , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2017-WEPVA034 http://cds.cern.ch/record/2289137 |
_version_ | 1780956331342036992 |
---|---|
author | Eriksson, Tommy Bartmann, Wolfgang Belochitskii, P Bojtár, Lajos Breuker, Horst Butin, Francois Carli, Christian Dupuy, Bruno Freyermuth, Pierre Jørgensen, Lars Lefort, Bertrand Mertens, Jennifer Oelert, Walter Ostojić, Ranko Pasinelli, Sergio Tranquille, Gerard |
author_facet | Eriksson, Tommy Bartmann, Wolfgang Belochitskii, P Bojtár, Lajos Breuker, Horst Butin, Francois Carli, Christian Dupuy, Bruno Freyermuth, Pierre Jørgensen, Lars Lefort, Bertrand Mertens, Jennifer Oelert, Walter Ostojić, Ranko Pasinelli, Sergio Tranquille, Gerard |
author_sort | Eriksson, Tommy |
collection | CERN |
description | ELENA (Extra Low ENergy Antiproton ring) is an upgrade project at the CERN AD (Antiproton Decelerator). The smaller ELENA ring will further decelerate 5.3 MeV antiprotons from the AD ring down to 100 keV using electron cooling to obtain good deceleration efficiency and dense beams. An increase of up to two orders of magnitude in trapping efficiency is expected at the AD experiments. This paper will report on the current status of ELENA where beam commissioning of the ring is now taking place. Phase one of the project installation has been completed with ring and injection lines in place, while phase two will finalize the project with installation of 100 keV transfer lines connecting the experiments to ELENA and is planned to take place in 2019/2020. |
id | oai-inspirehep.net-1626555 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2017 |
record_format | invenio |
spelling | oai-inspirehep.net-16265552019-09-30T06:29:59Zdoi:10.18429/JACoW-IPAC2017-WEPVA034http://cds.cern.ch/record/2289137engEriksson, TommyBartmann, WolfgangBelochitskii, PBojtár, LajosBreuker, HorstButin, FrancoisCarli, ChristianDupuy, BrunoFreyermuth, PierreJørgensen, LarsLefort, BertrandMertens, JenniferOelert, WalterOstojić, RankoPasinelli, SergioTranquille, GerardELENA - From Installation to CommissioningAccelerators and Storage RingsELENA (Extra Low ENergy Antiproton ring) is an upgrade project at the CERN AD (Antiproton Decelerator). The smaller ELENA ring will further decelerate 5.3 MeV antiprotons from the AD ring down to 100 keV using electron cooling to obtain good deceleration efficiency and dense beams. An increase of up to two orders of magnitude in trapping efficiency is expected at the AD experiments. This paper will report on the current status of ELENA where beam commissioning of the ring is now taking place. Phase one of the project installation has been completed with ring and injection lines in place, while phase two will finalize the project with installation of 100 keV transfer lines connecting the experiments to ELENA and is planned to take place in 2019/2020.CERN-ACC-2017-268oai:inspirehep.net:16265552017 |
spellingShingle | Accelerators and Storage Rings Eriksson, Tommy Bartmann, Wolfgang Belochitskii, P Bojtár, Lajos Breuker, Horst Butin, Francois Carli, Christian Dupuy, Bruno Freyermuth, Pierre Jørgensen, Lars Lefort, Bertrand Mertens, Jennifer Oelert, Walter Ostojić, Ranko Pasinelli, Sergio Tranquille, Gerard ELENA - From Installation to Commissioning |
title | ELENA - From Installation to Commissioning |
title_full | ELENA - From Installation to Commissioning |
title_fullStr | ELENA - From Installation to Commissioning |
title_full_unstemmed | ELENA - From Installation to Commissioning |
title_short | ELENA - From Installation to Commissioning |
title_sort | elena - from installation to commissioning |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-IPAC2017-WEPVA034 http://cds.cern.ch/record/2289137 |
work_keys_str_mv | AT erikssontommy elenafrominstallationtocommissioning AT bartmannwolfgang elenafrominstallationtocommissioning AT belochitskiip elenafrominstallationtocommissioning AT bojtarlajos elenafrominstallationtocommissioning AT breukerhorst elenafrominstallationtocommissioning AT butinfrancois elenafrominstallationtocommissioning AT carlichristian elenafrominstallationtocommissioning AT dupuybruno elenafrominstallationtocommissioning AT freyermuthpierre elenafrominstallationtocommissioning AT jørgensenlars elenafrominstallationtocommissioning AT lefortbertrand elenafrominstallationtocommissioning AT mertensjennifer elenafrominstallationtocommissioning AT oelertwalter elenafrominstallationtocommissioning AT ostojicranko elenafrominstallationtocommissioning AT pasinellisergio elenafrominstallationtocommissioning AT tranquillegerard elenafrominstallationtocommissioning |