Cargando…
CERN Accelerators Topology Configuration: Facing the Next Long Shutdown
The Configuration and Layout (CL) team at CERN ensures that there is a clear and coherent representation of the status of the CERN underground facilities (about 60 km of equipment) and main accelerator projects at a given point in time. In view of the major equipment changes to be carried out during...
Autores principales: | Bartolome-Jimenez, Sonia, Birtwistle, Thomas, Chemli, Samy, Gilbert, Nicolas, Perrot, Anne-Laure, Piar, Juraj, Simetka, Vojtech, Vazquez de Prada Planas, Blanca |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2017-THPAB145 http://cds.cern.ch/record/2289170 |
Ejemplares similares
-
Integration, Configuration and Coordination: from Project to Reality, at CERN
por: Barberan Marin, Maria, et al.
Publicado: (2016) -
Configuration Management Best Practices
por: Feral, Bruno, et al.
Publicado: (2022) -
360 Degree Panoramic Photographs During the Long Shutdown 2 of the CERN Machines and Facilities
por: Birtwistle, Thomas, et al.
Publicado: (2021) -
The machine configuration management as working framework
por: CHEMLI, Samy
Publicado: (2014) -
The Second Long Shutdown of the LHC and Its Injectors: Feedback from the Accelerator Coordination and Engineering Group
por: Perrot, Anne-Laure, et al.
Publicado: (2022)