Cargando…

Progress in the Bunch-to-Bucket Transfer Implementation for FAIR

The transfer of bunched ion beams between various synchrotrons is required for the multi-accelerator complex FAIR, presently under construction at GSI. To avoid a dedicated distribution infrastructure for radiofrequency (RF) signals between each source and destination synchrotron, a new approach has...

Descripción completa

Detalles Bibliográficos
Autores principales: Ferrand, Thibault, Bachmann, Oliver, Bai, Jiaoni, Damerau, Heiko, Klingbeil, Harald
Lenguaje:eng
Publicado: 2017
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2017-THPVA041
http://cds.cern.ch/record/2289175
_version_ 1780956339523026944
author Ferrand, Thibault
Bachmann, Oliver
Bai, Jiaoni
Damerau, Heiko
Klingbeil, Harald
author_facet Ferrand, Thibault
Bachmann, Oliver
Bai, Jiaoni
Damerau, Heiko
Klingbeil, Harald
author_sort Ferrand, Thibault
collection CERN
description The transfer of bunched ion beams between various synchrotrons is required for the multi-accelerator complex FAIR, presently under construction at GSI. To avoid a dedicated distribution infrastructure for radiofrequency (RF) signals between each source and destination synchrotron, a new approach has been developed to transmit bunch and bucket phase information using synchronous Ethernet. This allows to locally regenerate all reference signals needed for the RF synchronization prior to a bunch-to-bucket transfer, as well as the triggers to the kickers. The modular and configurable hardware implementation based on the White Rabbit network progresses towards a proof-of-principle demonstrator. Besides the synchronization of revolution and RF frequencies, the bunches in the source accelerator must be aligned in azimuth with respect to the buckets in the receiving synchrotron. To validate the feasibility of this azimuthal steering, measurements have been performed with protons in the CERN PS to evaluate the longitudinal emittance growth. They are complemented with tracking simulations using the BLonD code.
id oai-inspirehep.net-1627471
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2017
record_format invenio
spelling oai-inspirehep.net-16274712019-09-30T06:29:59Zdoi:10.18429/JACoW-IPAC2017-THPVA041http://cds.cern.ch/record/2289175engFerrand, ThibaultBachmann, OliverBai, JiaoniDamerau, HeikoKlingbeil, HaraldProgress in the Bunch-to-Bucket Transfer Implementation for FAIRAccelerators and Storage RingsThe transfer of bunched ion beams between various synchrotrons is required for the multi-accelerator complex FAIR, presently under construction at GSI. To avoid a dedicated distribution infrastructure for radiofrequency (RF) signals between each source and destination synchrotron, a new approach has been developed to transmit bunch and bucket phase information using synchronous Ethernet. This allows to locally regenerate all reference signals needed for the RF synchronization prior to a bunch-to-bucket transfer, as well as the triggers to the kickers. The modular and configurable hardware implementation based on the White Rabbit network progresses towards a proof-of-principle demonstrator. Besides the synchronization of revolution and RF frequencies, the bunches in the source accelerator must be aligned in azimuth with respect to the buckets in the receiving synchrotron. To validate the feasibility of this azimuthal steering, measurements have been performed with protons in the CERN PS to evaluate the longitudinal emittance growth. They are complemented with tracking simulations using the BLonD code.CERN-ACC-2017-230oai:inspirehep.net:16274712017
spellingShingle Accelerators and Storage Rings
Ferrand, Thibault
Bachmann, Oliver
Bai, Jiaoni
Damerau, Heiko
Klingbeil, Harald
Progress in the Bunch-to-Bucket Transfer Implementation for FAIR
title Progress in the Bunch-to-Bucket Transfer Implementation for FAIR
title_full Progress in the Bunch-to-Bucket Transfer Implementation for FAIR
title_fullStr Progress in the Bunch-to-Bucket Transfer Implementation for FAIR
title_full_unstemmed Progress in the Bunch-to-Bucket Transfer Implementation for FAIR
title_short Progress in the Bunch-to-Bucket Transfer Implementation for FAIR
title_sort progress in the bunch-to-bucket transfer implementation for fair
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-IPAC2017-THPVA041
http://cds.cern.ch/record/2289175
work_keys_str_mv AT ferrandthibault progressinthebunchtobuckettransferimplementationforfair
AT bachmannoliver progressinthebunchtobuckettransferimplementationforfair
AT baijiaoni progressinthebunchtobuckettransferimplementationforfair
AT damerauheiko progressinthebunchtobuckettransferimplementationforfair
AT klingbeilharald progressinthebunchtobuckettransferimplementationforfair