Cargando…
Progress in the Bunch-to-Bucket Transfer Implementation for FAIR
The transfer of bunched ion beams between various synchrotrons is required for the multi-accelerator complex FAIR, presently under construction at GSI. To avoid a dedicated distribution infrastructure for radiofrequency (RF) signals between each source and destination synchrotron, a new approach has...
Autores principales: | Ferrand, Thibault, Bachmann, Oliver, Bai, Jiaoni, Damerau, Heiko, Klingbeil, Harald |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2017-THPVA041 http://cds.cern.ch/record/2289175 |
Ejemplares similares
-
Synchronization of Synchrotrons for bunch-to-bucket Transfers
por: Ferrand, Thibault, et al.
Publicado: (2015) -
Longitudinal PS-SPS bunch-to-bucket transfer optimization for LHC beam
por: Papotti, G, et al.
Publicado: (2008) -
Proposal to transfer 8 SPS bunches into 8 LEP buckets
por: Baudrenghien, P, et al.
Publicado: (1991) -
Barrier bucket studies in the CERN PS
por: Vadai, Mihaly, et al.
Publicado: (2019) -
Implementation of synchronised PS-SPS transfer with barrier buckets
por: Vadai, M., et al.
Publicado: (2022)