Cargando…
HIE-ISOLDE SC Linac progress and commissioning in 2016
The HIE-ISOLDE project (High Intensity and Energy ISOLDE) reached an important milestone in October 2015 when the first physics run was carried out with radioactive Zn beams at 4 MV/m. This is a first stage in the upgrade of the REX post-accelerator, whereby the energy of the radioactive ion beams w...
Autores principales: | Venturini Delsolaro, Walter, Bravin, Enrico, Delruelle, Nicolas, Elias, Michal, Fadakis, Eleftherios, Ferreira Somoza, Jose, Formenti, Fabio, Fraser, Matthew, Gayde, Jean-Christophe, Guillotin, Nicolas, Kadi, Yacine, Kautzmann, Guillaume, Koettig, Torsten, Leclercq, Yann, Martino, Michele, Mician, Matej, Miyazaki, Akira, Montesinos, Eric, Parma, Vittorio, Rodriguez, Jose, Sadovich, Sergey, Siesling, Erwin, Smekens, David, Therasse, Mathieu, Valdarno, Luca, Valuch, Daniel, Vandoni, Giovanna, Wagner, Udo, Zhang, Pei |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-LINAC2016-WE1A05 http://cds.cern.ch/record/2304385 |
Ejemplares similares
-
HIE-ISOLDE: First Commissioning Experience
por: Venturini Delsolaro, Walter, et al.
Publicado: (2016) -
Status of the SRF systems at HIE-ISOLDE
por: Venturini Delsolaro, Walter, et al.
Publicado: (2015) -
Progress on the HIE-ISOLDE Facility
por: Kadi, Yacine, et al.
Publicado: (2016) -
Status of the HIE-ISOLDE Linac
por: Venturini Delsolaro, Walter, et al.
Publicado: (2014) -
Thermal Design and Performance results of the first High-Beta Cryo-module for HIE-ISOLDE at CERN
por: Valdarno, L, et al.
Publicado: (2015)