Cargando…

Assembling experience of the first two HIE-ISOLDE cryomodules

The assembly of the first two cryomodules (CM1 and CM2) of the new superconducting linear accelerator HIE-ISOLDE (High Intensity and Energy ISOLDE), located downstream of the REX-ISOLDE normal conducting accelerator, started one year and half ago. After a delicate assembly phase in the cleanroom whi...

Descripción completa

Detalles Bibliográficos
Autores principales: Therasse, Mathieu, Barlow, Graeme, Bizzaglia, Sauro, Capatina, Ofelia, Chrul, Anna, Demarest, Paul, Dequaire, Julien, Deschamps, Jean-Baptiste, Gayde, Jean-Christophe, Gourragne, Max, Harrison, Anthony, Kautzmann, Guillaume, Leclercq, Yann, Mergelkuhl, Dirk, Mikkola, Tommi, Miyazaki, Akira, Parma, Vittorio, Somoza, Jose, Struik, Michael, Teixeira Lopez, Silvia, Venturini Delsolaro, Walter, Williams, Lloyd, Zhang, Pei, Garlache, M
Lenguaje:eng
Publicado: 2017
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-LINAC2016-THPRC016
http://cds.cern.ch/record/2304389
_version_ 1780957463321772032
author Therasse, Mathieu
Barlow, Graeme
Bizzaglia, Sauro
Capatina, Ofelia
Chrul, Anna
Demarest, Paul
Dequaire, Julien
Deschamps, Jean-Baptiste
Gayde, Jean-Christophe
Gourragne, Max
Harrison, Anthony
Kautzmann, Guillaume
Leclercq, Yann
Mergelkuhl, Dirk
Mikkola, Tommi
Miyazaki, Akira
Parma, Vittorio
Somoza, Jose
Struik, Michael
Teixeira Lopez, Silvia
Venturini Delsolaro, Walter
Williams, Lloyd
Zhang, Pei
Garlache, M
author_facet Therasse, Mathieu
Barlow, Graeme
Bizzaglia, Sauro
Capatina, Ofelia
Chrul, Anna
Demarest, Paul
Dequaire, Julien
Deschamps, Jean-Baptiste
Gayde, Jean-Christophe
Gourragne, Max
Harrison, Anthony
Kautzmann, Guillaume
Leclercq, Yann
Mergelkuhl, Dirk
Mikkola, Tommi
Miyazaki, Akira
Parma, Vittorio
Somoza, Jose
Struik, Michael
Teixeira Lopez, Silvia
Venturini Delsolaro, Walter
Williams, Lloyd
Zhang, Pei
Garlache, M
author_sort Therasse, Mathieu
collection CERN
description The assembly of the first two cryomodules (CM1 and CM2) of the new superconducting linear accelerator HIE-ISOLDE (High Intensity and Energy ISOLDE), located downstream of the REX-ISOLDE normal conducting accelerator, started one year and half ago. After a delicate assembly phase in the cleanroom which lasted nine months, the first cryomodule was transported to the ISOLDE hall on 2 May 2015 and coupled to the existing REX-ISOLDE accelerator, increasing the energy of the radioactive ion beams from 2.8 to 4.3 MeV per nucleon. The superconducting linac supplied the CERN-ISOLDE Facility, with radioactive zinc ions until the end of the proton run in November 2015. At the beginning of 2016, the second cryomodule was installed in the machine, increasing the energy to 5.5 MeV per nucleon. During commissioning of the first cryomodule in summer 2015, it was found that the performance of the RF superconductive cavities was limited by the over-heating of their RF couplers. The decision was taken to refurbish CM1 and reinstall it at the end of April. In this paper, we present the challenges faced and the experience gained with the cleanroom assembly of the first two cryomodules, especially the construction of the SC RF cavities and their RF ancillaries.
id oai-inspirehep.net-1633274
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2017
record_format invenio
spelling oai-inspirehep.net-16332742022-03-07T14:38:41Zdoi:10.18429/JACoW-LINAC2016-THPRC016http://cds.cern.ch/record/2304389engTherasse, MathieuBarlow, GraemeBizzaglia, SauroCapatina, OfeliaChrul, AnnaDemarest, PaulDequaire, JulienDeschamps, Jean-BaptisteGayde, Jean-ChristopheGourragne, MaxHarrison, AnthonyKautzmann, GuillaumeLeclercq, YannMergelkuhl, DirkMikkola, TommiMiyazaki, AkiraParma, VittorioSomoza, JoseStruik, MichaelTeixeira Lopez, SilviaVenturini Delsolaro, WalterWilliams, LloydZhang, PeiGarlache, MAssembling experience of the first two HIE-ISOLDE cryomodulesAccelerators and Storage RingsThe assembly of the first two cryomodules (CM1 and CM2) of the new superconducting linear accelerator HIE-ISOLDE (High Intensity and Energy ISOLDE), located downstream of the REX-ISOLDE normal conducting accelerator, started one year and half ago. After a delicate assembly phase in the cleanroom which lasted nine months, the first cryomodule was transported to the ISOLDE hall on 2 May 2015 and coupled to the existing REX-ISOLDE accelerator, increasing the energy of the radioactive ion beams from 2.8 to 4.3 MeV per nucleon. The superconducting linac supplied the CERN-ISOLDE Facility, with radioactive zinc ions until the end of the proton run in November 2015. At the beginning of 2016, the second cryomodule was installed in the machine, increasing the energy to 5.5 MeV per nucleon. During commissioning of the first cryomodule in summer 2015, it was found that the performance of the RF superconductive cavities was limited by the over-heating of their RF couplers. The decision was taken to refurbish CM1 and reinstall it at the end of April. In this paper, we present the challenges faced and the experience gained with the cleanroom assembly of the first two cryomodules, especially the construction of the SC RF cavities and their RF ancillaries.CERN-ACC-2017-347oai:inspirehep.net:16332742017
spellingShingle Accelerators and Storage Rings
Therasse, Mathieu
Barlow, Graeme
Bizzaglia, Sauro
Capatina, Ofelia
Chrul, Anna
Demarest, Paul
Dequaire, Julien
Deschamps, Jean-Baptiste
Gayde, Jean-Christophe
Gourragne, Max
Harrison, Anthony
Kautzmann, Guillaume
Leclercq, Yann
Mergelkuhl, Dirk
Mikkola, Tommi
Miyazaki, Akira
Parma, Vittorio
Somoza, Jose
Struik, Michael
Teixeira Lopez, Silvia
Venturini Delsolaro, Walter
Williams, Lloyd
Zhang, Pei
Garlache, M
Assembling experience of the first two HIE-ISOLDE cryomodules
title Assembling experience of the first two HIE-ISOLDE cryomodules
title_full Assembling experience of the first two HIE-ISOLDE cryomodules
title_fullStr Assembling experience of the first two HIE-ISOLDE cryomodules
title_full_unstemmed Assembling experience of the first two HIE-ISOLDE cryomodules
title_short Assembling experience of the first two HIE-ISOLDE cryomodules
title_sort assembling experience of the first two hie-isolde cryomodules
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-LINAC2016-THPRC016
http://cds.cern.ch/record/2304389
work_keys_str_mv AT therassemathieu assemblingexperienceofthefirsttwohieisoldecryomodules
AT barlowgraeme assemblingexperienceofthefirsttwohieisoldecryomodules
AT bizzagliasauro assemblingexperienceofthefirsttwohieisoldecryomodules
AT capatinaofelia assemblingexperienceofthefirsttwohieisoldecryomodules
AT chrulanna assemblingexperienceofthefirsttwohieisoldecryomodules
AT demarestpaul assemblingexperienceofthefirsttwohieisoldecryomodules
AT dequairejulien assemblingexperienceofthefirsttwohieisoldecryomodules
AT deschampsjeanbaptiste assemblingexperienceofthefirsttwohieisoldecryomodules
AT gaydejeanchristophe assemblingexperienceofthefirsttwohieisoldecryomodules
AT gourragnemax assemblingexperienceofthefirsttwohieisoldecryomodules
AT harrisonanthony assemblingexperienceofthefirsttwohieisoldecryomodules
AT kautzmannguillaume assemblingexperienceofthefirsttwohieisoldecryomodules
AT leclercqyann assemblingexperienceofthefirsttwohieisoldecryomodules
AT mergelkuhldirk assemblingexperienceofthefirsttwohieisoldecryomodules
AT mikkolatommi assemblingexperienceofthefirsttwohieisoldecryomodules
AT miyazakiakira assemblingexperienceofthefirsttwohieisoldecryomodules
AT parmavittorio assemblingexperienceofthefirsttwohieisoldecryomodules
AT somozajose assemblingexperienceofthefirsttwohieisoldecryomodules
AT struikmichael assemblingexperienceofthefirsttwohieisoldecryomodules
AT teixeiralopezsilvia assemblingexperienceofthefirsttwohieisoldecryomodules
AT venturinidelsolarowalter assemblingexperienceofthefirsttwohieisoldecryomodules
AT williamslloyd assemblingexperienceofthefirsttwohieisoldecryomodules
AT zhangpei assemblingexperienceofthefirsttwohieisoldecryomodules
AT garlachem assemblingexperienceofthefirsttwohieisoldecryomodules