2016 Availability summary
The LHC exhibited unprecedented availability during the 2016 proton Run, producing more than 40 fb-1 of integrated luminosity, significantly above the original target of 25 fb-1. This was achieved while running steadily with a peak luminosity above the design target of 1*10 34 cm-2 s-1. Individual s...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2017
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2293511 |
_version_ | 1780956553021489152 |
---|---|
author | Apollonio, A Ponce, L Roderick, C Schmidt, R Todd, B Zerlauth, M |
author_facet | Apollonio, A Ponce, L Roderick, C Schmidt, R Todd, B Zerlauth, M |
author_sort | Apollonio, A |
collection | CERN |
description | The LHC exhibited unprecedented availability during the 2016 proton Run, producing more than 40 fb-1 of integrated luminosity, significantly above the original target of 25 fb-1. This was achieved while running steadily with a peak luminosity above the design target of 1*10 34 cm-2 s-1. Individual system performance and an increased experience with the machine were fundamental to achieve these goals, following the consolidations and improvements deployed during the Long Shutdown 1 and the Year End Technical Stop in 2015 (YETS 15-16). In this presentation, the 2016 LHC availability statistics for the proton Run are presented and discussed, with a focus on the main contributors to downtime. |
id | oai-inspirehep.net-1635349 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2017 |
publisher | CERN |
record_format | invenio |
spelling | oai-inspirehep.net-16353492019-09-30T06:29:59Zhttp://cds.cern.ch/record/2293511engApollonio, APonce, LRoderick, CSchmidt, RTodd, BZerlauth, M2016 Availability summaryAccelerators and Storage RingsThe LHC exhibited unprecedented availability during the 2016 proton Run, producing more than 40 fb-1 of integrated luminosity, significantly above the original target of 25 fb-1. This was achieved while running steadily with a peak luminosity above the design target of 1*10 34 cm-2 s-1. Individual system performance and an increased experience with the machine were fundamental to achieve these goals, following the consolidations and improvements deployed during the Long Shutdown 1 and the Year End Technical Stop in 2015 (YETS 15-16). In this presentation, the 2016 LHC availability statistics for the proton Run are presented and discussed, with a focus on the main contributors to downtime.CERNoai:inspirehep.net:16353492017 |
spellingShingle | Accelerators and Storage Rings Apollonio, A Ponce, L Roderick, C Schmidt, R Todd, B Zerlauth, M 2016 Availability summary |
title | 2016 Availability summary |
title_full | 2016 Availability summary |
title_fullStr | 2016 Availability summary |
title_full_unstemmed | 2016 Availability summary |
title_short | 2016 Availability summary |
title_sort | 2016 availability summary |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/2293511 |
work_keys_str_mv | AT apollonioa 2016availabilitysummary AT poncel 2016availabilitysummary AT roderickc 2016availabilitysummary AT schmidtr 2016availabilitysummary AT toddb 2016availabilitysummary AT zerlauthm 2016availabilitysummary |