Cargando…
MKI performance during 2016 and plans for EYETS
Substantial upgrades were carried out to the MKI beam screen during LSl: MKI heating has not lirrrited LHC operation since LSl, and is not expected to do so during Run 2. Similarly, during LSl, the vacuum systems on the interconnects between MKl magnets were upgraded: as a result there haven't...
Autores principales: | Barnes, M J, Bartmann, W, Bracco, C, Ducimetiere, L, Goddard, B, Bregliozzi, G, Cid, L Vega, Vallgren, C Yin, Vlachodimitropoulos, V, Weterings, W |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2017
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2293529 |
Ejemplares similares
-
An Upgraded LHC Injection Kicker Magnet
por: Barnes, Michael, et al.
Publicado: (2018) -
Operational experience of the upgraded LHC injection kicker magnets during Run 2 and future plans
por: Barnes, M J, et al.
Publicado: (2017) -
MKI UFOs at Injection
por: Baer, T, et al.
Publicado: (2011) -
Operational experience of a prototype LHC injection kicker magnet with a low SEY coating and redistributed power deposition
por: Barnes, Michael, et al.
Publicado: (2019) -
EYETS recovery
por: Camillocci, M Solfaroli, et al.
Publicado: (2017)