Cargando…
2015 availability summary
This paper presents an overview on LHC availability in 2015, covering the period from 6 th April to 13 th December. The reference data-set for the presented results is coming from the Accelerator Fault Tracker (AFT), which was used in 2015 by members of the Availability Working Group for availabilit...
Autores principales: | , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2016
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2294508 |
Sumario: | This paper presents an overview on LHC availability in 2015, covering the period
from 6 th April to 13 th December. The reference data-set for the presented
results is coming from the Accelerator Fault Tracker (AFT), which was used in
2015 by members of the Availability Working Group for availability tracking. The
main contributors to LHC downtime (Cryogenic system, Power Converters, Quench
Protection System) are analysed in detail in the paper, highlighting relevant
dependencies on other systems and operational modes. The concept of the
availability matrix is introduced to describe the performance of hardware
systems. The presented availability studies focus on the 25 ns and Ion Run in
2015, to derive reference figures for the upcoming 2016 Run. |
---|