Cargando…
QPS - operational aspects
The status of the quench protection system after LS1 is reviewed, between challenges and major faults. The energy extraction issues are also analysed. Attention then focuses on the operational software tools and interfaces. The foreseen major modifications and improvements during YETS are discussed.
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2016
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2294509 |
_version_ | 1780956652471582720 |
---|---|
author | Pojer, M |
author_facet | Pojer, M |
author_sort | Pojer, M |
collection | CERN |
description | The status of the quench protection system after LS1 is reviewed, between
challenges and major faults. The energy extraction issues are also analysed.
Attention then focuses on the operational software tools and interfaces. The
foreseen major modifications and improvements during YETS are discussed. |
id | oai-inspirehep.net-1637696 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2016 |
publisher | CERN |
record_format | invenio |
spelling | oai-inspirehep.net-16376962019-09-30T06:29:59Zhttp://cds.cern.ch/record/2294509engPojer, MQPS - operational aspectsAccelerators and Storage RingsThe status of the quench protection system after LS1 is reviewed, between challenges and major faults. The energy extraction issues are also analysed. Attention then focuses on the operational software tools and interfaces. The foreseen major modifications and improvements during YETS are discussed.CERNoai:inspirehep.net:16376962016 |
spellingShingle | Accelerators and Storage Rings Pojer, M QPS - operational aspects |
title | QPS - operational aspects |
title_full | QPS - operational aspects |
title_fullStr | QPS - operational aspects |
title_full_unstemmed | QPS - operational aspects |
title_short | QPS - operational aspects |
title_sort | qps - operational aspects |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/2294509 |
work_keys_str_mv | AT pojerm qpsoperationalaspects |